search_doffin
Search Norwegian public procurement notices on Doffin.
Direct GET
For navigating agents: open the HTML page with parameters in the URL. The result is fetched and displayed without screenshots or form filling.
Open this validated HTML GET URL
https://allemannsdata.com/wiki/kilder/doffin/search_doffin/?query=&types={types}&statuses={statuses}&contract_nature={contract_nature}&cpv_codes={cpv_codes}&locations={locations}&buyer={buyer}&winner={winner}&date_from={date_from}&date_to={date_to}&sort_by=RELEVANCE&page=1&hits_per_page=10&include_placeholders=false&limit=25&offset=0
For software and dashboards:
Read the operation descriptor.
The JSON GET template is https://allemannsdata.com/wiki/api/v1/kilder/doffin/search_doffin?query=&types={types}&statuses={statuses}&contract_nature={contract_nature}&cpv_codes={cpv_codes}&locations={locations}&buyer={buyer}&winner={winner}&date_from={date_from}&date_to={date_to}&sort_by=RELEVANCE&page=1&hits_per_page=10&include_placeholders=false&limit=25&offset=0.
Open this exact request as JSON.
| Parameter | Requirement | JSON type | Description |
|---|---|---|---|
query | optional | string | Free-text search (Norwegian or English), e.g. "IT-drift", "snørydding", "rammeavtale konsulent". Start here. |
types | optional | union | Filter by notice type. Parent types: PLANNING, COMPETITION, RESULT. Specific types: ANNOUNCEMENT_OF_COMPETITION, DYNAMIC_PURCHASING_SCHEME, QUALIFICATION_SCHEME, ANNOUNCEMENT_OF_INTENT, PRE_ANNOUNCEMENT, ADVISORY_NOTICE, NOTICE_ON_BUYER_PROFILE, ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT, CHANGE_OF_CONCLUSION_OF_CONTRACT, CANCELLED_OR_MISSING_CONCLUSION_OF_CONTRACT. Use ["COMPETITION"] + statuses=["ACTIVE"] for open tenders. |
statuses | optional | union | ACTIVE (open for bids), EXPIRED, AWARDED, CANCELLED. |
contract_nature | optional | union | WORKS, SERVICES and/or SUPPLIES. |
cpv_codes | optional | union | 8-digit CPV codes, e.g. ["45000000"]. Matches the code and its children. Find codes with search_cpv_codes(). Best combined with a free-text query. |
locations | optional | union | NUTS-style location ids, e.g. ["NO060"] (Trøndelag), or "anyw" for non-location-bound. See list_location_codes(). |
buyer | optional | union | Buyer organization full name(s) exactly as written on notices, e.g. ["Trondheim kommune"]. Resolved to Doffin's internal buyer id via a free-text lookup; names that match no buyer are reported in "note" and, if none match, no results are returned (rather than an unfiltered search). Pass the 32-hex buyer id from a result's buyer field directly to skip the lookup. |
winner | optional | union | Doffin's internal supplier id (32-hex). Winner names cannot be used - they are not present in search results to resolve against. |
date_from | optional | union | Publication date lower bound, "YYYY-MM-DD". |
date_to | optional | union | Publication date upper bound, "YYYY-MM-DD". |
sort_by | optional | string | RELEVANCE (default), PUBLICATION_DATE_DESC, PUBLICATION_DATE_ASC, DEADLINE, ESTIMATED_VALUE_ASC, ESTIMATED_VALUE_DESC. |
page | optional | integer | 1-based page number. |
hits_per_page | optional | integer | 1-50 (default 10). |
include_placeholders | optional | boolean | By default, hits whose buyer fields look like unfilled eForm template values (org id 123456789, placeholder buyer names) are dropped from the results as junk. Set True to keep them, each flagged with "possible_placeholder": true. |
limit | optional | integer | Gateway page size; default 25, maximum 100. |
offset | optional | integer | Number of list items to skip; default 0. |
Generated JavaScript, Python and response structure
Use JSON when the user requests code, machine-readable data, value extraction or further computation. Use the HTML GET page to identify the correct source and verify parameters.
Example for generated JavaScript and Python
https://allemannsdata.com/wiki/api/v1/kilder/doffin/search_doffin?query=&types={types}&statuses={statuses}&contract_nature={contract_nature}&cpv_codes={cpv_codes}&locations={locations}&buyer={buyer}&winner={winner}&date_from={date_from}&date_to={date_to}&sort_by=RELEVANCE&page=1&hits_per_page=10&include_placeholders=false&limit=25&offset=0
Replace URL placeholders and remove unused optional parameters.
JavaScript in a dashboard
const url = "https://allemannsdata.com/wiki/api/v1/kilder/doffin/search_doffin?query=&types={types}&statuses={statuses}&contract_nature={contract_nature}&cpv_codes={cpv_codes}&locations={locations}&buyer={buyer}&winner={winner}&date_from={date_from}&date_to={date_to}&sort_by=RELEVANCE&page=1&hits_per_page=10&include_placeholders=false&limit=25&offset=0";
const response = await fetch(url);
if (!response.ok) {
const failure = await response.json();
throw new Error(`${failure.error.code}: ${failure.error.message} ${failure.suggestion}`);
}
const result = await response.json();
const data = result.data;
Python without additional packages
import json
from urllib.request import urlopen
url = "https://allemannsdata.com/wiki/api/v1/kilder/doffin/search_doffin?query=&types={types}&statuses={statuses}&contract_nature={contract_nature}&cpv_codes={cpv_codes}&locations={locations}&buyer={buyer}&winner={winner}&date_from={date_from}&date_to={date_to}&sort_by=RELEVANCE&page=1&hits_per_page=10&include_placeholders=false&limit=25&offset=0"
with urlopen(url) as response:
result = json.load(response)
data = result["data"]
Response structure
{
"source": "doffin",
"operation": "search_doffin",
"parameters": {},
"data": {},
"entities": [],
"_meta": {"retrieved_at": "...", "sources": [], "cache": {}},
"_links": {"self": "...", "source": "...", "wiki": "...", "feedback": "..."}
}
Form for manual use
The form is a fallback for people and browser agents that cannot open the GET URL directly.
Result
- total_count:
- 9
- hits:
9 results
- id:
- 2025-108672
- buyer:
1 results
- id:
- 87fbced3b743b740f97f5ba8bc13a745
- organization_id:
- 871 035 032
- name:
- IVAR IKS
- heading:
- 132032 IVAR sorting plant 2.0. K6601 Electro-mechanical works sorting plant
- description:
- IVAR's sorting facility with separate lines for sorting of residual waste and sorting of paper burned down in the summer of 2022. The plant will now be re-established. The residual waste sorting facility will be re-established as a MRF plant located in the same building as before. The paper sorting facility will be established at a new location (not yet finally selected). A joint contract will include both the sorting facility for residual waste and for paper. Residual waste sorting plant: A contract shall be entered into for the electromechanical turn-key delivery of sorting facilities for mixed residual waste from households. Capacity: 40 tons/hour The facility will sort out the following fractions: - Mixed plastic - Magnetic Metal - Non-magnetic metal - Tetra - Possible options: o Other options may be included Paper sorting plant Electromechanical turn-key delivery sorting plant for cardboard, paper, beverage carton The facility will sort on the following fractions: - cardboard/cardboard - Reading material/newspapers/magazines - Drinking carton - Mixed cardboard/paper/carton
- location_id:
1 results
- NO0A1
- estimatedValue:
- currencyCode:
- EUR
- amount:
- 300000000.0
- type:
- ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT
- allTypes:
2 results
- ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT
- RESULT
- status:
- not reported by source
- issueDate:
- 2025-06-02T09:24:16Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2025-06-03
- placeOfPerformance:
- procurementStrategicLabels:
No results.
- id:
- 2024-110545
- buyer:
1 results
- id:
- 1a715a5dd3f0e0c9cdeb99922bdc1210
- organization_id:
- 917445060
- name:
- Norske tog AS
- heading:
- Procurement of new long-distance Trains
- description:
- Det vises til Contract 20-22 - "Class N10 FLIRT long distance trainsets", inngått mellom Norske tog og Stadler Bussnang AG. Kontraktsinngåelse ble kunngjort 31.03.2023. Etter kontraktsinngåelse har Norske tog, sammen med operatørene, besluttet at det er nødvendig å gjøre en justering knyttet til "electrical coupler". Endringen gjelder: "The electrical coupler head of the automatic front coupler is removed for the large-size Multiple Units, since it is not foreseen that there will be any multiple operation with another large-size or short-size Trainsets." Justeringen innebærer en endring/oppdatering av et I-krav. I kontrakten er I-krav definert som "For informational purposes only, not subject to evaluation. " Dette gjelder følgende I-krav: A02:8.1.b (I) - "An automatic coupler include both mechanical (including pneumatical) and electrical coupling/uncoupling possibilities and enable automatic coupling/uncoupling as well as a manual coupling/uncoupling." Partene er enig om å endre kravet til: A02:8.1.b (I) - "An automatic coupler include both mechanical (including pneumatical) and electrical coupling/uncoupling possibilities and enable automatic coupling/uncoupling as well as a manual coupling/uncoupling. For front end couplers of a large-size Multiple Unit the electrical coupling possibility may be removed." Justeringen innebærer ikke en endring for M-krav, men det nevnte I-kravet har en tilknytning til et M-krav. I kontrakten er M-krav definert som: "Mandatory requirements which must be fulfilled. NT will assess the requirements as either passed or failed. Failed fulfillment of a requirement leads to rejection of the Tender." M-kravet dette gjelder er: A02:8.1.1.a: "For Multiple Units and Configurable Units automatic couplers shall be mounted in both ends".
- location_id:
1 results
- anyw
- estimatedValue:
- not reported by source
- type:
- ANNOUNCEMENT_OF_INTENT
- allTypes:
2 results
- ANNOUNCEMENT_OF_INTENT
- RESULT
- status:
- not reported by source
- issueDate:
- 2024-07-04T13:06:49Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2024-07-08
- placeOfPerformance:
- procurementStrategicLabels:
No results.
- id:
- 2023-622973
- buyer:
1 results
- id:
- 1a715a5dd3f0e0c9cdeb99922bdc1210
- organization_id:
- 917 445 060
- name:
- Norske tog AS
- heading:
- Procurement of new long-distance Trains
- description:
- The purpose of this procurement is to purchase new Trainsets and appurtenant goods and services, primarily for use in a long-distance service.
- location_id:
No results.
- estimatedValue:
- not reported by source
- type:
- ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT
- allTypes:
2 results
- ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT
- RESULT
- status:
- not reported by source
- issueDate:
- 2023-03-31T10:00:00Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2023-03-31
- placeOfPerformance:
No results.
- procurementStrategicLabels:
No results.
- id:
- 2019-319247
- buyer:
1 results
- id:
- 5703d0a665626f9ecf219e3acf455912
- organization_id:
- 938 626 367
- name:
- Hordaland fylkeskommune
- heading:
- Anskaffelse av 6 sporvogner til Bybanens byggetrinn 4
- description:
- Hordaland fylkeskommune har inngått kontrakt med Stadler Pankow GmbH for kjøp av 6 sporvogner til Bybanens byggetrinn 4.
- location_id:
1 results
- anyw
- estimatedValue:
- not reported by source
- type:
- ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT
- allTypes:
2 results
- ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT
- RESULT
- status:
- not reported by source
- issueDate:
- 2019-09-25T10:00:00Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2019-09-25
- placeOfPerformance:
No results.
- procurementStrategicLabels:
No results.
- id:
- 2019-348927
- buyer:
1 results
- id:
- 5703d0a665626f9ecf219e3acf455912
- organization_id:
- 938 626 367
- name:
- Hordaland fylkeskommune
- heading:
- Intensjonskunngjøring-anskaffelse av 6 sporvogner til Bybanens byggetrinn 4
- description:
- Hordaland fylkeskommune har som intensjon å inngå kontrakt med Stadler Pankow GmbH på kjøp av 6 sporvogner til Bybanens byggetrinn 4.
- location_id:
No results.
- estimatedValue:
- not reported by source
- type:
- ANNOUNCEMENT_OF_INTENT
- allTypes:
2 results
- ANNOUNCEMENT_OF_INTENT
- RESULT
- status:
- not reported by source
- issueDate:
- 2019-08-15T10:00:00Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2019-08-15
- placeOfPerformance:
No results.
- procurementStrategicLabels:
No results.
- id:
- 2026-100643
- buyer:
1 results
- id:
- 1a715a5dd3f0e0c9cdeb99922bdc1210
- organization_id:
- 917445060
- name:
- Norske tog AS
- heading:
- Anskaffelse av data for Flirt-kjøretøy
- description:
- Norske tog har til formål i å utvikle sitt eget Online Condition Monitoring system (heretter kalt OCM-system). For å kunne utvikle systemet, er Norske tog avhengig av fullstendig og korrekt data fra Flirt-kjøretøyene. I perioden 2008-2012 anskaffet NSB kjøretøyene gjennom en funksjonsbasert konkurranse, hvor Stadler Rail Service Center (heretter kalt Stadler) var vinnende tilbyder. Kjøretøyene ble levert med integrerte system og proprietær datapipeline til sin Rail Data Services (RDS). Stadler har utviklet et spesialtilpasset OCM-system (RDS), som dekoder og visualiserer signalene fra kjøretøyene. Systemet er teknisk eksklusivt og tett integrert med kjøretøyets arkitektur. Norske Tog AS har behov for tilgang på fullstendig og korrekt data fra FLIRT-kjøretøyene. Det er kun Stadler som kan levere dette. Dermed tildeles kontrakt direkte da det er kun en leverandør som kan oppfylle kravene.
- location_id:
1 results
- anyw
- estimatedValue:
- not reported by source
- type:
- ANNOUNCEMENT_OF_INTENT
- allTypes:
2 results
- ANNOUNCEMENT_OF_INTENT
- RESULT
- status:
- not reported by source
- issueDate:
- 2026-01-09T12:38:10Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2026-01-12
- placeOfPerformance:
- procurementStrategicLabels:
No results.
- id:
- 2025-106595
- buyer:
1 results
- id:
- c1b4e768fcee661e4f3c07cdd05e8de4
- organization_id:
- 992051825
- name:
- Bybanen Utbygging
- heading:
- Rail Signalling
- description:
- Bybaneprosjektet i Bergen ønsker å inngå kontrakt med en totalentreprenør for signalanlegg for byggetrinn 5 - Bergen sentrum - Åsane. Det overordnede omfanget omfatter en totalentreprise for prosjektering, innkjøp, bygging og installasjon (EPCI) for et skinnesignalsystem, et skinnebryterkontrollsystem, et skinnebrytervarmesystem, punktmaskiner, LAN, sentralsystem, inkludert sikkerhetsdokumentasjon og tilhørende godkjenningsprosesser for Bybaneprosjektet, byggetrinn 5A med opsjoner for de videre byggetrinnene. Se konkurransegrunnlag
- location_id:
1 results
- NO0A2
- estimatedValue:
- currencyCode:
- EUR
- amount:
- 12000000.0
- type:
- ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT
- allTypes:
2 results
- ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT
- RESULT
- status:
- not reported by source
- issueDate:
- 2025-04-24T14:10:59Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2025-04-28
- placeOfPerformance:
- procurementStrategicLabels:
No results.
- id:
- 2025-117631
- buyer:
1 results
- id:
- 1a715a5dd3f0e0c9cdeb99922bdc1210
- organization_id:
- 917445060
- name:
- Norske tog AS
- heading:
- Upgrade of Traction Converters (PEC Modules) in FLIRT Trainsets
- description:
- Norske tog AS owns and manages a fleet of FLIRT trainsets (types 74, 75, and 76) delivered by Stadler Rail between 2012 and 2023. Most of the fleet (types 74 and 75) uses traction converters with PEC2 microprocessor cards from ABB/Hitachi, which have been declared end-of-life as of 31 December 2023. This will gradually reduce repair and spare part availability, increasing the risk of operational disruptions and higher maintenance costs. The newer type 76 trainsets use PEC3 modules, which are not considered critical for replacement at this time. The PEC module is a key component of the traction converter, controlling power delivery to the train�s traction motors and auxiliary systems. The design and software are proprietary to ABB/Hitachi, and the vehicle control system can only be modified by Stadler. Any upgrade must ensure full compatibility with existing systems and safety requirements. Norske tog is considering a fleet-wide upgrade from PEC2 to a newer platform (e.g., PEC4) to ensure long-term reliability and cost-effectiveness. While we believe this may be a task best suited for the original manufacturer or supplier, Norwegian procurement regulations require us to investigate whether alternative suppliers or solutions exist. This RFI is for information gathering only. All input will be considered in the further planning process.
- location_id:
1 results
- anyw
- estimatedValue:
- currencyCode:
- NOK
- amount:
- 400000000.0
- type:
- ADVISORY_NOTICE
- allTypes:
2 results
- ADVISORY_NOTICE
- PLANNING
- status:
- not reported by source
- issueDate:
- 2025-11-19T15:12:32Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2025-11-21
- placeOfPerformance:
- procurementStrategicLabels:
No results.
- id:
- 2023-390751
- buyer:
1 results
- id:
- c1b4e768fcee661e4f3c07cdd05e8de4
- organization_id:
- 992 051 825
- name:
- Bybanen Utbygging
- heading:
- E41 Banesignal
- description:
- Bybanen Utbygging er i ferd med å forberede anskaffelse av banesignalanlegget for Bybanen byggetrinn 5 fra Bergen sentrum til Åsane. Anskaffelsen skal etter planen kunngjøres i slutten av dette året, og kontrakten signeres med valgt entreprenør på sensommeren 2024. Linjen skal etter planen realiseres i to byggetrinn. Første etappe er ca. 2,5 km dobbeltspor fra sentrum til Amalie Skrams Vei (Sandviken) med mulig åpning 2028. Neste etappe er ca. 10 km dobbeltspor fra Amalie Skrams Vei til Åsane og skal etter planen åpnes 2033. Denne etappen inkluderer også en parkeringshall i Åsane. I tillegg vil kontrakten også ha opsjoner for ytterligere byggetrinn. Anskaffelsen vil bli gjennomført som en forhandlingsprosedyre i to trinn, og kontrakten vil være en totalentreprise (EPCI-kontrakt (Engineering, Procurement, Commissioning and Installation)) som vil omfatte banesignalanlegg, sporvekselstyring, sentralsystem og drivmaskiner for sporveksler.
- location_id:
No results.
- estimatedValue:
- not reported by source
- type:
- ADVISORY_NOTICE
- allTypes:
2 results
- ADVISORY_NOTICE
- PLANNING
- status:
- not reported by source
- issueDate:
- 2023-09-08T10:00:00Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2023-09-08
- placeOfPerformance:
No results.
- procurementStrategicLabels:
No results.
- limit:
- 25
- offset:
- 0
- returned:
- 9
- has_more_results:
- no
Show all fields in HTML
- total_count:
- 9
- hits:
9 results
- id:
- 2025-108672
- buyer:
1 results
- id:
- 87fbced3b743b740f97f5ba8bc13a745
- organization_id:
- 871 035 032
- name:
- IVAR IKS
- heading:
- 132032 IVAR sorting plant 2.0. K6601 Electro-mechanical works sorting plant
- description:
- IVAR's sorting facility with separate lines for sorting of residual waste and sorting of paper burned down in the summer of 2022. The plant will now be re-established. The residual waste sorting facility will be re-established as a MRF plant located in the same building as before. The paper sorting facility will be established at a new location (not yet finally selected). A joint contract will include both the sorting facility for residual waste and for paper. Residual waste sorting plant: A contract shall be entered into for the electromechanical turn-key delivery of sorting facilities for mixed residual waste from households. Capacity: 40 tons/hour The facility will sort out the following fractions: - Mixed plastic - Magnetic Metal - Non-magnetic metal - Tetra - Possible options: o Other options may be included Paper sorting plant Electromechanical turn-key delivery sorting plant for cardboard, paper, beverage carton The facility will sort on the following fractions: - cardboard/cardboard - Reading material/newspapers/magazines - Drinking carton - Mixed cardboard/paper/carton
- location_id:
1 results
- NO0A1
- estimatedValue:
- currencyCode:
- EUR
- amount:
- 300000000.0
- type:
- ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT
- allTypes:
2 results
- ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT
- RESULT
- status:
- not reported by source
- issueDate:
- 2025-06-02T09:24:16Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2025-06-03
- placeOfPerformance:
- procurementStrategicLabels:
No results.
- id:
- 2024-110545
- buyer:
1 results
- id:
- 1a715a5dd3f0e0c9cdeb99922bdc1210
- organization_id:
- 917445060
- name:
- Norske tog AS
- heading:
- Procurement of new long-distance Trains
- description:
- Det vises til Contract 20-22 - "Class N10 FLIRT long distance trainsets", inngått mellom Norske tog og Stadler Bussnang AG. Kontraktsinngåelse ble kunngjort 31.03.2023. Etter kontraktsinngåelse har Norske tog, sammen med operatørene, besluttet at det er nødvendig å gjøre en justering knyttet til "electrical coupler". Endringen gjelder: "The electrical coupler head of the automatic front coupler is removed for the large-size Multiple Units, since it is not foreseen that there will be any multiple operation with another large-size or short-size Trainsets." Justeringen innebærer en endring/oppdatering av et I-krav. I kontrakten er I-krav definert som "For informational purposes only, not subject to evaluation. " Dette gjelder følgende I-krav: A02:8.1.b (I) - "An automatic coupler include both mechanical (including pneumatical) and electrical coupling/uncoupling possibilities and enable automatic coupling/uncoupling as well as a manual coupling/uncoupling." Partene er enig om å endre kravet til: A02:8.1.b (I) - "An automatic coupler include both mechanical (including pneumatical) and electrical coupling/uncoupling possibilities and enable automatic coupling/uncoupling as well as a manual coupling/uncoupling. For front end couplers of a large-size Multiple Unit the electrical coupling possibility may be removed." Justeringen innebærer ikke en endring for M-krav, men det nevnte I-kravet har en tilknytning til et M-krav. I kontrakten er M-krav definert som: "Mandatory requirements which must be fulfilled. NT will assess the requirements as either passed or failed. Failed fulfillment of a requirement leads to rejection of the Tender." M-kravet dette gjelder er: A02:8.1.1.a: "For Multiple Units and Configurable Units automatic couplers shall be mounted in both ends".
- location_id:
1 results
- anyw
- estimatedValue:
- not reported by source
- type:
- ANNOUNCEMENT_OF_INTENT
- allTypes:
2 results
- ANNOUNCEMENT_OF_INTENT
- RESULT
- status:
- not reported by source
- issueDate:
- 2024-07-04T13:06:49Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2024-07-08
- placeOfPerformance:
- procurementStrategicLabels:
No results.
- id:
- 2023-622973
- buyer:
1 results
- id:
- 1a715a5dd3f0e0c9cdeb99922bdc1210
- organization_id:
- 917 445 060
- name:
- Norske tog AS
- heading:
- Procurement of new long-distance Trains
- description:
- The purpose of this procurement is to purchase new Trainsets and appurtenant goods and services, primarily for use in a long-distance service.
- location_id:
No results.
- estimatedValue:
- not reported by source
- type:
- ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT
- allTypes:
2 results
- ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT
- RESULT
- status:
- not reported by source
- issueDate:
- 2023-03-31T10:00:00Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2023-03-31
- placeOfPerformance:
No results.
- procurementStrategicLabels:
No results.
- id:
- 2019-319247
- buyer:
1 results
- id:
- 5703d0a665626f9ecf219e3acf455912
- organization_id:
- 938 626 367
- name:
- Hordaland fylkeskommune
- heading:
- Anskaffelse av 6 sporvogner til Bybanens byggetrinn 4
- description:
- Hordaland fylkeskommune har inngått kontrakt med Stadler Pankow GmbH for kjøp av 6 sporvogner til Bybanens byggetrinn 4.
- location_id:
1 results
- anyw
- estimatedValue:
- not reported by source
- type:
- ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT
- allTypes:
2 results
- ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT
- RESULT
- status:
- not reported by source
- issueDate:
- 2019-09-25T10:00:00Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2019-09-25
- placeOfPerformance:
No results.
- procurementStrategicLabels:
No results.
- id:
- 2019-348927
- buyer:
1 results
- id:
- 5703d0a665626f9ecf219e3acf455912
- organization_id:
- 938 626 367
- name:
- Hordaland fylkeskommune
- heading:
- Intensjonskunngjøring-anskaffelse av 6 sporvogner til Bybanens byggetrinn 4
- description:
- Hordaland fylkeskommune har som intensjon å inngå kontrakt med Stadler Pankow GmbH på kjøp av 6 sporvogner til Bybanens byggetrinn 4.
- location_id:
No results.
- estimatedValue:
- not reported by source
- type:
- ANNOUNCEMENT_OF_INTENT
- allTypes:
2 results
- ANNOUNCEMENT_OF_INTENT
- RESULT
- status:
- not reported by source
- issueDate:
- 2019-08-15T10:00:00Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2019-08-15
- placeOfPerformance:
No results.
- procurementStrategicLabels:
No results.
- id:
- 2026-100643
- buyer:
1 results
- id:
- 1a715a5dd3f0e0c9cdeb99922bdc1210
- organization_id:
- 917445060
- name:
- Norske tog AS
- heading:
- Anskaffelse av data for Flirt-kjøretøy
- description:
- Norske tog har til formål i å utvikle sitt eget Online Condition Monitoring system (heretter kalt OCM-system). For å kunne utvikle systemet, er Norske tog avhengig av fullstendig og korrekt data fra Flirt-kjøretøyene. I perioden 2008-2012 anskaffet NSB kjøretøyene gjennom en funksjonsbasert konkurranse, hvor Stadler Rail Service Center (heretter kalt Stadler) var vinnende tilbyder. Kjøretøyene ble levert med integrerte system og proprietær datapipeline til sin Rail Data Services (RDS). Stadler har utviklet et spesialtilpasset OCM-system (RDS), som dekoder og visualiserer signalene fra kjøretøyene. Systemet er teknisk eksklusivt og tett integrert med kjøretøyets arkitektur. Norske Tog AS har behov for tilgang på fullstendig og korrekt data fra FLIRT-kjøretøyene. Det er kun Stadler som kan levere dette. Dermed tildeles kontrakt direkte da det er kun en leverandør som kan oppfylle kravene.
- location_id:
1 results
- anyw
- estimatedValue:
- not reported by source
- type:
- ANNOUNCEMENT_OF_INTENT
- allTypes:
2 results
- ANNOUNCEMENT_OF_INTENT
- RESULT
- status:
- not reported by source
- issueDate:
- 2026-01-09T12:38:10Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2026-01-12
- placeOfPerformance:
- procurementStrategicLabels:
No results.
- id:
- 2025-106595
- buyer:
1 results
- id:
- c1b4e768fcee661e4f3c07cdd05e8de4
- organization_id:
- 992051825
- name:
- Bybanen Utbygging
- heading:
- Rail Signalling
- description:
- Bybaneprosjektet i Bergen ønsker å inngå kontrakt med en totalentreprenør for signalanlegg for byggetrinn 5 - Bergen sentrum - Åsane. Det overordnede omfanget omfatter en totalentreprise for prosjektering, innkjøp, bygging og installasjon (EPCI) for et skinnesignalsystem, et skinnebryterkontrollsystem, et skinnebrytervarmesystem, punktmaskiner, LAN, sentralsystem, inkludert sikkerhetsdokumentasjon og tilhørende godkjenningsprosesser for Bybaneprosjektet, byggetrinn 5A med opsjoner for de videre byggetrinnene. Se konkurransegrunnlag
- location_id:
1 results
- NO0A2
- estimatedValue:
- currencyCode:
- EUR
- amount:
- 12000000.0
- type:
- ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT
- allTypes:
2 results
- ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT
- RESULT
- status:
- not reported by source
- issueDate:
- 2025-04-24T14:10:59Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2025-04-28
- placeOfPerformance:
- procurementStrategicLabels:
No results.
- id:
- 2025-117631
- buyer:
1 results
- id:
- 1a715a5dd3f0e0c9cdeb99922bdc1210
- organization_id:
- 917445060
- name:
- Norske tog AS
- heading:
- Upgrade of Traction Converters (PEC Modules) in FLIRT Trainsets
- description:
- Norske tog AS owns and manages a fleet of FLIRT trainsets (types 74, 75, and 76) delivered by Stadler Rail between 2012 and 2023. Most of the fleet (types 74 and 75) uses traction converters with PEC2 microprocessor cards from ABB/Hitachi, which have been declared end-of-life as of 31 December 2023. This will gradually reduce repair and spare part availability, increasing the risk of operational disruptions and higher maintenance costs. The newer type 76 trainsets use PEC3 modules, which are not considered critical for replacement at this time. The PEC module is a key component of the traction converter, controlling power delivery to the train�s traction motors and auxiliary systems. The design and software are proprietary to ABB/Hitachi, and the vehicle control system can only be modified by Stadler. Any upgrade must ensure full compatibility with existing systems and safety requirements. Norske tog is considering a fleet-wide upgrade from PEC2 to a newer platform (e.g., PEC4) to ensure long-term reliability and cost-effectiveness. While we believe this may be a task best suited for the original manufacturer or supplier, Norwegian procurement regulations require us to investigate whether alternative suppliers or solutions exist. This RFI is for information gathering only. All input will be considered in the further planning process.
- location_id:
1 results
- anyw
- estimatedValue:
- currencyCode:
- NOK
- amount:
- 400000000.0
- type:
- ADVISORY_NOTICE
- allTypes:
2 results
- ADVISORY_NOTICE
- PLANNING
- status:
- not reported by source
- issueDate:
- 2025-11-19T15:12:32Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2025-11-21
- placeOfPerformance:
- procurementStrategicLabels:
No results.
- id:
- 2023-390751
- buyer:
1 results
- id:
- c1b4e768fcee661e4f3c07cdd05e8de4
- organization_id:
- 992 051 825
- name:
- Bybanen Utbygging
- heading:
- E41 Banesignal
- description:
- Bybanen Utbygging er i ferd med å forberede anskaffelse av banesignalanlegget for Bybanen byggetrinn 5 fra Bergen sentrum til Åsane. Anskaffelsen skal etter planen kunngjøres i slutten av dette året, og kontrakten signeres med valgt entreprenør på sensommeren 2024. Linjen skal etter planen realiseres i to byggetrinn. Første etappe er ca. 2,5 km dobbeltspor fra sentrum til Amalie Skrams Vei (Sandviken) med mulig åpning 2028. Neste etappe er ca. 10 km dobbeltspor fra Amalie Skrams Vei til Åsane og skal etter planen åpnes 2033. Denne etappen inkluderer også en parkeringshall i Åsane. I tillegg vil kontrakten også ha opsjoner for ytterligere byggetrinn. Anskaffelsen vil bli gjennomført som en forhandlingsprosedyre i to trinn, og kontrakten vil være en totalentreprise (EPCI-kontrakt (Engineering, Procurement, Commissioning and Installation)) som vil omfatte banesignalanlegg, sporvekselstyring, sentralsystem og drivmaskiner for sporveksler.
- location_id:
No results.
- estimatedValue:
- not reported by source
- type:
- ADVISORY_NOTICE
- allTypes:
2 results
- ADVISORY_NOTICE
- PLANNING
- status:
- not reported by source
- issueDate:
- 2023-09-08T10:00:00Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2023-09-08
- placeOfPerformance:
No results.
- procurementStrategicLabels:
No results.
- limit:
- 25
- offset:
- 0
- returned:
- 9
- has_more_results:
- no
Will you use the result in generated code?
Is data missing or incorrect? Send feedback about this result.
Continue exploring
How an AI agent should use this page
Ground rule: Navigate with HTML GET links to keep explanations and relationships. Use the page's JSON alternative only when concrete values must be extracted, compared or computed.
How to use the search_doffin lookup
- Replace the placeholders in the HTML GET template; remove optional parameters you do not need.
- Check types, units, limits and ID formats in the parameter table.
- Follow linked results to canonical pages before combining sources.
Misreading to avoid: An empty list means "no results for this lookup". An error message or unavailable source does not mean the data does not exist.
Source-specific next step
- Follow the notice ID to the canonical page; use CPV and location codes to narrow broad free-text searches.
Go to the source page for other operations. Use the JSON template only after the HTML result shows that the parameters and source are correct.
AI agent? Read the complete navigation and programming guide.