search_doffin
Search Norwegian public procurement notices on Doffin.
Direct GET
For navigating agents: open the HTML page with parameters in the URL. The result is fetched and displayed without screenshots or form filling.
Open this validated HTML GET URL
https://allemannsdata.com/wiki/kilder/doffin/search_doffin/?query=&types={types}&statuses={statuses}&contract_nature={contract_nature}&cpv_codes={cpv_codes}&locations={locations}&buyer={buyer}&winner={winner}&date_from={date_from}&date_to={date_to}&sort_by=RELEVANCE&page=1&hits_per_page=10&include_placeholders=false&limit=25&offset=0
For software and dashboards:
Read the operation descriptor.
The JSON GET template is https://allemannsdata.com/wiki/api/v1/kilder/doffin/search_doffin?query=&types={types}&statuses={statuses}&contract_nature={contract_nature}&cpv_codes={cpv_codes}&locations={locations}&buyer={buyer}&winner={winner}&date_from={date_from}&date_to={date_to}&sort_by=RELEVANCE&page=1&hits_per_page=10&include_placeholders=false&limit=25&offset=0.
Open this exact request as JSON.
| Parameter | Requirement | JSON type | Description |
|---|---|---|---|
query | optional | string | Free-text search (Norwegian or English), e.g. "IT-drift", "snørydding", "rammeavtale konsulent". Start here. |
types | optional | union | Filter by notice type. Parent types: PLANNING, COMPETITION, RESULT. Specific types: ANNOUNCEMENT_OF_COMPETITION, DYNAMIC_PURCHASING_SCHEME, QUALIFICATION_SCHEME, ANNOUNCEMENT_OF_INTENT, PRE_ANNOUNCEMENT, ADVISORY_NOTICE, NOTICE_ON_BUYER_PROFILE, ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT, CHANGE_OF_CONCLUSION_OF_CONTRACT, CANCELLED_OR_MISSING_CONCLUSION_OF_CONTRACT. Use ["COMPETITION"] + statuses=["ACTIVE"] for open tenders. |
statuses | optional | union | ACTIVE (open for bids), EXPIRED, AWARDED, CANCELLED. |
contract_nature | optional | union | WORKS, SERVICES and/or SUPPLIES. |
cpv_codes | optional | union | 8-digit CPV codes, e.g. ["45000000"]. Matches the code and its children. Find codes with search_cpv_codes(). Best combined with a free-text query. |
locations | optional | union | NUTS-style location ids, e.g. ["NO060"] (Trøndelag), or "anyw" for non-location-bound. See list_location_codes(). |
buyer | optional | union | Buyer organization full name(s) exactly as written on notices, e.g. ["Trondheim kommune"]. Resolved to Doffin's internal buyer id via a free-text lookup; names that match no buyer are reported in "note" and, if none match, no results are returned (rather than an unfiltered search). Pass the 32-hex buyer id from a result's buyer field directly to skip the lookup. |
winner | optional | union | Doffin's internal supplier id (32-hex). Winner names cannot be used - they are not present in search results to resolve against. |
date_from | optional | union | Publication date lower bound, "YYYY-MM-DD". |
date_to | optional | union | Publication date upper bound, "YYYY-MM-DD". |
sort_by | optional | string | RELEVANCE (default), PUBLICATION_DATE_DESC, PUBLICATION_DATE_ASC, DEADLINE, ESTIMATED_VALUE_ASC, ESTIMATED_VALUE_DESC. |
page | optional | integer | 1-based page number. |
hits_per_page | optional | integer | 1-50 (default 10). |
include_placeholders | optional | boolean | By default, hits whose buyer fields look like unfilled eForm template values (org id 123456789, placeholder buyer names) are dropped from the results as junk. Set True to keep them, each flagged with "possible_placeholder": true. |
limit | optional | integer | Gateway page size; default 25, maximum 100. |
offset | optional | integer | Number of list items to skip; default 0. |
Generated JavaScript, Python and response structure
Use JSON when the user requests code, machine-readable data, value extraction or further computation. Use the HTML GET page to identify the correct source and verify parameters.
Example for generated JavaScript and Python
https://allemannsdata.com/wiki/api/v1/kilder/doffin/search_doffin?query=&types={types}&statuses={statuses}&contract_nature={contract_nature}&cpv_codes={cpv_codes}&locations={locations}&buyer={buyer}&winner={winner}&date_from={date_from}&date_to={date_to}&sort_by=RELEVANCE&page=1&hits_per_page=10&include_placeholders=false&limit=25&offset=0
Replace URL placeholders and remove unused optional parameters.
JavaScript in a dashboard
const url = "https://allemannsdata.com/wiki/api/v1/kilder/doffin/search_doffin?query=&types={types}&statuses={statuses}&contract_nature={contract_nature}&cpv_codes={cpv_codes}&locations={locations}&buyer={buyer}&winner={winner}&date_from={date_from}&date_to={date_to}&sort_by=RELEVANCE&page=1&hits_per_page=10&include_placeholders=false&limit=25&offset=0";
const response = await fetch(url);
if (!response.ok) {
const failure = await response.json();
throw new Error(`${failure.error.code}: ${failure.error.message} ${failure.suggestion}`);
}
const result = await response.json();
const data = result.data;
Python without additional packages
import json
from urllib.request import urlopen
url = "https://allemannsdata.com/wiki/api/v1/kilder/doffin/search_doffin?query=&types={types}&statuses={statuses}&contract_nature={contract_nature}&cpv_codes={cpv_codes}&locations={locations}&buyer={buyer}&winner={winner}&date_from={date_from}&date_to={date_to}&sort_by=RELEVANCE&page=1&hits_per_page=10&include_placeholders=false&limit=25&offset=0"
with urlopen(url) as response:
result = json.load(response)
data = result["data"]
Response structure
{
"source": "doffin",
"operation": "search_doffin",
"parameters": {},
"data": {},
"entities": [],
"_meta": {"retrieved_at": "...", "sources": [], "cache": {}},
"_links": {"self": "...", "source": "...", "wiki": "...", "feedback": "..."}
}
Form for manual use
The form is a fallback for people and browser agents that cannot open the GET URL directly.
Result
- total_count:
- 37
- hits:
10 results
- id:
- 2021-334101
- buyer:
1 results
- id:
- 6605e66d24aa9bf394905c155fe81164
- organization_id:
- 988517860
- name:
- Forsvaret v/Forsvarets logistikkorganisasjon
- heading:
- Kontraktstildeling anskaffelse av feltuniform og membranuniform
- description:
- Anskaffelsen av feltuniformer og membranuniformer gjennom etablering av to rammeavtaler (delområde 1 og delområde 2).
- location_id:
1 results
- NO0
- estimatedValue:
- not reported by source
- type:
- ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT
- allTypes:
2 results
- ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT
- RESULT
- status:
- not reported by source
- issueDate:
- 2021-07-22T10:00:00Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2021-07-22
- placeOfPerformance:
No results.
- procurementStrategicLabels:
No results.
- id:
- 2017-769766
- buyer:
1 results
- id:
- 7c4978aaf222e1a13a64adab14076794
- organization_id:
- 915 070 434
- name:
- Sporveien Oslo AS
- heading:
- Painting/Foliation of MX3000 Metro Trains
- description:
- Sporveien Oslo AS is considering to paint or foliate all the MX 3000 metro trains. The main purpose of this RFI process is to identify possible solutions for a most cost-efficient way to conduct paint or foliation and identify budget cost for the upgrade, in the market.
- location_id:
1 results
- NO0
- estimatedValue:
- not reported by source
- type:
- ADVISORY_NOTICE
- allTypes:
2 results
- ADVISORY_NOTICE
- PLANNING
- status:
- not reported by source
- issueDate:
- 2017-01-05T10:00:00Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2017-01-05
- placeOfPerformance:
No results.
- procurementStrategicLabels:
No results.
- id:
- 2025-107675
- buyer:
1 results
- id:
- 417d81277743d17a8f644ddecf3ea0f3
- organization_id:
- 974446871
- name:
- Nasjonal kommunikasjonsmyndighet (Nkom)
- heading:
- Market survey LRIC
- description:
- The Norwegian Communications Authority intends to contract with one tenderer for the purpose of assistance in developing a cost model, or update an existing model, based on an LR(A)IC methodology. The cost model will comply with the legal framework, including the relevant EC recommendation(s) and the European Electronic Communications Code (EECC). Commission Recommendation of 6 February 2024 on the regulatory promotion of Gigabit Connectivity, provides guidelines for the conceptual choices to be made. Technologies within scope of this assignment are FTTH technologies. This will at least include both P2P (‘point-to-point’) and PON (‘passive optical network’). The Cost model must have the capability to calculate costs for different types of operators with different scale and scope. The model will provide for cost modelling with Point of Handover at different network levels. It will also be able to provide for cost modelling of physical access (“fibre LLUB”), VULA, bitstream as well as access to pipes or subpipes. The model should also be capable of calculating separate costs for different types of geographic areas within an operator’s coverage.
- location_id:
1 results
- anyw
- estimatedValue:
- not reported by source
- type:
- ADVISORY_NOTICE
- allTypes:
2 results
- ADVISORY_NOTICE
- PLANNING
- status:
- not reported by source
- issueDate:
- 2025-05-15T07:57:15Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2025-05-16
- placeOfPerformance:
- procurementStrategicLabels:
No results.
- id:
- 2026-104807
- buyer:
1 results
- id:
- 417d81277743d17a8f644ddecf3ea0f3
- organization_id:
- 974446871
- name:
- Nasjonal kommunikasjonsmyndighet (Nkom)
- heading:
- Procurement of the development of an LR(A)IC model for delivery to the Norwegian Communications Authority
- description:
- The Norwegian Communications Authority intends to contract with one tenderer for the purpose of assistance in developing a cost model, or update existing model, based on an LR(A)IC methodology. As part of the assignment, the tender shall independently assess the strengths and weaknesses of various conceptual choices and assist Nkom in evaluating and determining the final conceptual choices for the chosen cost model. The selected tenderer must assist Nkom in developing a cost model that complies with the legal framework, including the relevant EC recommendation(s) and the European Electronic Communications Code (EECC). Commission Recommendation of 6 February 2024 on the regulatory promotion of Gigabit Connectivity, provides guidelines for the conceptual choices to be made.
- location_id:
1 results
- anyw
- estimatedValue:
- currencyCode:
- NOK
- amount:
- 8000000.0
- type:
- ANNOUNCEMENT_OF_COMPETITION
- allTypes:
2 results
- COMPETITION
- ANNOUNCEMENT_OF_COMPETITION
- status:
- EXPIRED
- issueDate:
- 2026-03-09T18:00:39Z
- deadline:
- 2026-04-13T10:00:00Z
- sentToTed:
- yes
- publicationDate:
- 2026-03-11
- placeOfPerformance:
- procurementStrategicLabels:
No results.
- id:
- 2023-630189
- buyer:
1 results
- id:
- ece64cbed397d681fa0c3dc1293061a8
- organization_id:
- 917 082 308
- name:
- Bane NOR SF
- heading:
- Key figures database
- description:
- The purpose of this Request For Information (RFI) is to gather information from vendors regarding available products or potential solutions that can provide the necessary insight to achieve Bane NOR’s business goals. Bane NOR is seeking information about products and experiences that meet their key figures database requirements, including operation, maintenance, and ongoing development. As such Bane NOR is considering the purchase of a "key figures database" tool for estimation purposes. This system would collect historical data from various sources to provide functionality and support for cost and time estimates related to building new railways and estimating the life cycle costs of maintaining railways in Norway.
- location_id:
No results.
- estimatedValue:
- not reported by source
- type:
- ADVISORY_NOTICE
- allTypes:
2 results
- ADVISORY_NOTICE
- PLANNING
- status:
- not reported by source
- issueDate:
- 2023-05-04T10:00:00Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2023-05-04
- placeOfPerformance:
No results.
- procurementStrategicLabels:
No results.
- id:
- 2023-677816
- buyer:
1 results
- id:
- ece64cbed397d681fa0c3dc1293061a8
- organization_id:
- 917 082 308
- name:
- Bane NOR SF
- heading:
- Request for information
- description:
- The purpose of this Request For Information (RFI) is to gather information from vendors regarding available products or potential solutions that can provide the necessary insight to achieve Bane NOR’s business goals. Bane NOR is seeking information about products and experiences that meet their key figures database requirements, including operation, maintenance, and ongoing development. As such Bane NOR is considering the purchase of a "key figures database" tool for estimation purposes. This system would collect historical data from various sources to provide functionality and support for cost and time estimates related to building new railways and estimating the life cycle costs of maintaining railways in Norway.
- location_id:
No results.
- estimatedValue:
- not reported by source
- type:
- ADVISORY_NOTICE
- allTypes:
2 results
- ADVISORY_NOTICE
- PLANNING
- status:
- not reported by source
- issueDate:
- 2023-04-27T10:00:00Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2023-04-27
- placeOfPerformance:
No results.
- procurementStrategicLabels:
No results.
- id:
- 2024-117665
- buyer:
1 results
- id:
- bed87b482aba566c9511f70f17cf6dc3
- organization_id:
- 916075855
- name:
- FORSVARSMATERIELL
- heading:
- RFI - Mine diver influence training system
- description:
- Norwegian Defence Materiel Agency (NDMA) is conducting a request for information of equipment for exercise and training of mine divers that shall perform actions near influence sea mines for demolition or neutralization. The purpose of this survey is to gather information on existing systems, technical and operational data as well as life cycle cost (LCC) estimates and obsolescence preventions.See attached documents for a more in-depth description.The deadline to provide the information is Friday 24. January 2025.
- location_id:
1 results
- NO0A2
- estimatedValue:
- not reported by source
- type:
- ADVISORY_NOTICE
- allTypes:
2 results
- ADVISORY_NOTICE
- PLANNING
- status:
- not reported by source
- issueDate:
- 2024-12-09T12:06:43Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2024-12-09
- placeOfPerformance:
- procurementStrategicLabels:
No results.
- id:
- 2019-317268
- buyer:
1 results
- id:
- 5165b20dd67de51b657552cfed2eee8c
- organization_id:
- 913 074 270
- name:
- Avinor Flysikring AS
- heading:
- RFI UAS Traffic Management System (UTM)
- description:
- The main objective for Avinor ANS is to achieve a cost efficient system in support of providing safe air traffic control services in Norway. The amount of requests to operate drones inside the 5 km zone of airports and other airspaces is increasing, and Avinor ANS is therefor considering procuring an UTM-system for handling drone activity in a safe manner, both in relation to airports aswell as controlled and uncontrolled airspace.
- location_id:
No results.
- estimatedValue:
- not reported by source
- type:
- ADVISORY_NOTICE
- allTypes:
2 results
- ADVISORY_NOTICE
- PLANNING
- status:
- not reported by source
- issueDate:
- 2019-01-10T10:00:00Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2019-01-10
- placeOfPerformance:
No results.
- procurementStrategicLabels:
No results.
- id:
- 2025-121268
- buyer:
1 results
- id:
- 665c4e3bf13fcf1b924218d5e61cd338
- organization_id:
- 977 161 630
- name:
- Energidepartementet
- heading:
- Study of the effects of dual policy instruments to reduce CO2 emissions in the Norwegian petroleum sector
- description:
- The majority of emissions from petroleum activities on the Norwegian continental shelf are subject to dual use of policy instruments (a carbon tax and the European emission trading system), resulting in high emission costs for the Norwegian petroleum sector. At the moment - the only two realistic solutions to reduce emission costs close to zero - are by replacing existing energy supply with power from shore or by shutting down the installations. Existing installations that are suitable for full or partial operation with power from shore already have implemented or are implementing such a solution. For the remaining installations, power from shore is seen as unrealistic, due to technical limitations, high cost and/or short remaining production period. Therefore, high emission costs resulting from the dual use of policy instruments (CO? tax and EU ETS) may, among other things, lead to fields and installations being shut down earlier than they otherwise would have been. The Ministry wants an independent study of the effects of a CO2-tax on top of EU ETS on future deliveries of oil and gas from the NCS, the net present value of production of oil and gas, production emissions and the net income to the state from the sector. The assignment will commence as soon as possible. The assignment should result in a written public report. The deliverables should be divided into a presentation of preliminary results, a first draft of report and a final report. The assignment is to be delivered within three months of contract signing. The consultant is to participate in meetings with the Ministry as agreed, but at a minimum, a start-up meeting, a status meeting with presentation of preliminary results, and a meeting to present the final report. The value of the procurement is estimated between 1 and 2 million NOK excl. VAT. This estimate is not binding for the Contracting authority. For further information on the scope and content of the procurement, we refer to appendix 1.
- location_id:
1 results
- anyw
- estimatedValue:
- currencyCode:
- NOK
- amount:
- 2000000.0
- type:
- ANNOUNCEMENT_OF_COMPETITION
- allTypes:
2 results
- COMPETITION
- ANNOUNCEMENT_OF_COMPETITION
- status:
- EXPIRED
- issueDate:
- 2025-12-19T15:33:37Z
- deadline:
- 2026-01-26T11:00:00Z
- sentToTed:
- yes
- publicationDate:
- 2025-12-23
- placeOfPerformance:
- procurementStrategicLabels:
No results.
- id:
- 2025-106762
- buyer:
1 results
- id:
- 3e6cca67e0586c20567c6349931f6b2e
- organization_id:
- 984661177
- name:
- Vygruppen AS
- heading:
- RFI: Remote Online Condition Monitoring for rolling stock
- description:
- The Vy Group AS (Vy) wants to explore the possibilities of installing Remote Online Monitoring system for rolling stock in Norway and Sweden. This is to both increase insight in rolling stock sensor data and potential savings and optimize maintenance cost. We are planning to issue an RFP during 2025 and wish to obtain up-to-date information about solutions that exist in the market today and the price-level to expect before we issue the RFP.
- location_id:
No results.
- estimatedValue:
- not reported by source
- type:
- ADVISORY_NOTICE
- allTypes:
2 results
- ADVISORY_NOTICE
- PLANNING
- status:
- not reported by source
- issueDate:
- 2025-04-29T09:55:06Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2025-04-30
- placeOfPerformance:
No results.
- procurementStrategicLabels:
No results.
- limit:
- 25
- offset:
- 0
- returned:
- 10
- has_more_results:
- yes
- truncated:
- yes
- next_offset:
- 10
Show all fields in HTML
- total_count:
- 37
- hits:
10 results
- id:
- 2021-334101
- buyer:
1 results
- id:
- 6605e66d24aa9bf394905c155fe81164
- organization_id:
- 988517860
- name:
- Forsvaret v/Forsvarets logistikkorganisasjon
- heading:
- Kontraktstildeling anskaffelse av feltuniform og membranuniform
- description:
- Anskaffelsen av feltuniformer og membranuniformer gjennom etablering av to rammeavtaler (delområde 1 og delområde 2).
- location_id:
1 results
- NO0
- estimatedValue:
- not reported by source
- type:
- ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT
- allTypes:
2 results
- ANNOUNCEMENT_OF_CONCLUSION_OF_CONTRACT
- RESULT
- status:
- not reported by source
- issueDate:
- 2021-07-22T10:00:00Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2021-07-22
- placeOfPerformance:
No results.
- procurementStrategicLabels:
No results.
- id:
- 2017-769766
- buyer:
1 results
- id:
- 7c4978aaf222e1a13a64adab14076794
- organization_id:
- 915 070 434
- name:
- Sporveien Oslo AS
- heading:
- Painting/Foliation of MX3000 Metro Trains
- description:
- Sporveien Oslo AS is considering to paint or foliate all the MX 3000 metro trains. The main purpose of this RFI process is to identify possible solutions for a most cost-efficient way to conduct paint or foliation and identify budget cost for the upgrade, in the market.
- location_id:
1 results
- NO0
- estimatedValue:
- not reported by source
- type:
- ADVISORY_NOTICE
- allTypes:
2 results
- ADVISORY_NOTICE
- PLANNING
- status:
- not reported by source
- issueDate:
- 2017-01-05T10:00:00Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2017-01-05
- placeOfPerformance:
No results.
- procurementStrategicLabels:
No results.
- id:
- 2025-107675
- buyer:
1 results
- id:
- 417d81277743d17a8f644ddecf3ea0f3
- organization_id:
- 974446871
- name:
- Nasjonal kommunikasjonsmyndighet (Nkom)
- heading:
- Market survey LRIC
- description:
- The Norwegian Communications Authority intends to contract with one tenderer for the purpose of assistance in developing a cost model, or update an existing model, based on an LR(A)IC methodology. The cost model will comply with the legal framework, including the relevant EC recommendation(s) and the European Electronic Communications Code (EECC). Commission Recommendation of 6 February 2024 on the regulatory promotion of Gigabit Connectivity, provides guidelines for the conceptual choices to be made. Technologies within scope of this assignment are FTTH technologies. This will at least include both P2P (‘point-to-point’) and PON (‘passive optical network’). The Cost model must have the capability to calculate costs for different types of operators with different scale and scope. The model will provide for cost modelling with Point of Handover at different network levels. It will also be able to provide for cost modelling of physical access (“fibre LLUB”), VULA, bitstream as well as access to pipes or subpipes. The model should also be capable of calculating separate costs for different types of geographic areas within an operator’s coverage.
- location_id:
1 results
- anyw
- estimatedValue:
- not reported by source
- type:
- ADVISORY_NOTICE
- allTypes:
2 results
- ADVISORY_NOTICE
- PLANNING
- status:
- not reported by source
- issueDate:
- 2025-05-15T07:57:15Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2025-05-16
- placeOfPerformance:
- procurementStrategicLabels:
No results.
- id:
- 2026-104807
- buyer:
1 results
- id:
- 417d81277743d17a8f644ddecf3ea0f3
- organization_id:
- 974446871
- name:
- Nasjonal kommunikasjonsmyndighet (Nkom)
- heading:
- Procurement of the development of an LR(A)IC model for delivery to the Norwegian Communications Authority
- description:
- The Norwegian Communications Authority intends to contract with one tenderer for the purpose of assistance in developing a cost model, or update existing model, based on an LR(A)IC methodology. As part of the assignment, the tender shall independently assess the strengths and weaknesses of various conceptual choices and assist Nkom in evaluating and determining the final conceptual choices for the chosen cost model. The selected tenderer must assist Nkom in developing a cost model that complies with the legal framework, including the relevant EC recommendation(s) and the European Electronic Communications Code (EECC). Commission Recommendation of 6 February 2024 on the regulatory promotion of Gigabit Connectivity, provides guidelines for the conceptual choices to be made.
- location_id:
1 results
- anyw
- estimatedValue:
- currencyCode:
- NOK
- amount:
- 8000000.0
- type:
- ANNOUNCEMENT_OF_COMPETITION
- allTypes:
2 results
- COMPETITION
- ANNOUNCEMENT_OF_COMPETITION
- status:
- EXPIRED
- issueDate:
- 2026-03-09T18:00:39Z
- deadline:
- 2026-04-13T10:00:00Z
- sentToTed:
- yes
- publicationDate:
- 2026-03-11
- placeOfPerformance:
- procurementStrategicLabels:
No results.
- id:
- 2023-630189
- buyer:
1 results
- id:
- ece64cbed397d681fa0c3dc1293061a8
- organization_id:
- 917 082 308
- name:
- Bane NOR SF
- heading:
- Key figures database
- description:
- The purpose of this Request For Information (RFI) is to gather information from vendors regarding available products or potential solutions that can provide the necessary insight to achieve Bane NOR’s business goals. Bane NOR is seeking information about products and experiences that meet their key figures database requirements, including operation, maintenance, and ongoing development. As such Bane NOR is considering the purchase of a "key figures database" tool for estimation purposes. This system would collect historical data from various sources to provide functionality and support for cost and time estimates related to building new railways and estimating the life cycle costs of maintaining railways in Norway.
- location_id:
No results.
- estimatedValue:
- not reported by source
- type:
- ADVISORY_NOTICE
- allTypes:
2 results
- ADVISORY_NOTICE
- PLANNING
- status:
- not reported by source
- issueDate:
- 2023-05-04T10:00:00Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2023-05-04
- placeOfPerformance:
No results.
- procurementStrategicLabels:
No results.
- id:
- 2023-677816
- buyer:
1 results
- id:
- ece64cbed397d681fa0c3dc1293061a8
- organization_id:
- 917 082 308
- name:
- Bane NOR SF
- heading:
- Request for information
- description:
- The purpose of this Request For Information (RFI) is to gather information from vendors regarding available products or potential solutions that can provide the necessary insight to achieve Bane NOR’s business goals. Bane NOR is seeking information about products and experiences that meet their key figures database requirements, including operation, maintenance, and ongoing development. As such Bane NOR is considering the purchase of a "key figures database" tool for estimation purposes. This system would collect historical data from various sources to provide functionality and support for cost and time estimates related to building new railways and estimating the life cycle costs of maintaining railways in Norway.
- location_id:
No results.
- estimatedValue:
- not reported by source
- type:
- ADVISORY_NOTICE
- allTypes:
2 results
- ADVISORY_NOTICE
- PLANNING
- status:
- not reported by source
- issueDate:
- 2023-04-27T10:00:00Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2023-04-27
- placeOfPerformance:
No results.
- procurementStrategicLabels:
No results.
- id:
- 2024-117665
- buyer:
1 results
- id:
- bed87b482aba566c9511f70f17cf6dc3
- organization_id:
- 916075855
- name:
- FORSVARSMATERIELL
- heading:
- RFI - Mine diver influence training system
- description:
- Norwegian Defence Materiel Agency (NDMA) is conducting a request for information of equipment for exercise and training of mine divers that shall perform actions near influence sea mines for demolition or neutralization. The purpose of this survey is to gather information on existing systems, technical and operational data as well as life cycle cost (LCC) estimates and obsolescence preventions.See attached documents for a more in-depth description.The deadline to provide the information is Friday 24. January 2025.
- location_id:
1 results
- NO0A2
- estimatedValue:
- not reported by source
- type:
- ADVISORY_NOTICE
- allTypes:
2 results
- ADVISORY_NOTICE
- PLANNING
- status:
- not reported by source
- issueDate:
- 2024-12-09T12:06:43Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2024-12-09
- placeOfPerformance:
- procurementStrategicLabels:
No results.
- id:
- 2019-317268
- buyer:
1 results
- id:
- 5165b20dd67de51b657552cfed2eee8c
- organization_id:
- 913 074 270
- name:
- Avinor Flysikring AS
- heading:
- RFI UAS Traffic Management System (UTM)
- description:
- The main objective for Avinor ANS is to achieve a cost efficient system in support of providing safe air traffic control services in Norway. The amount of requests to operate drones inside the 5 km zone of airports and other airspaces is increasing, and Avinor ANS is therefor considering procuring an UTM-system for handling drone activity in a safe manner, both in relation to airports aswell as controlled and uncontrolled airspace.
- location_id:
No results.
- estimatedValue:
- not reported by source
- type:
- ADVISORY_NOTICE
- allTypes:
2 results
- ADVISORY_NOTICE
- PLANNING
- status:
- not reported by source
- issueDate:
- 2019-01-10T10:00:00Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2019-01-10
- placeOfPerformance:
No results.
- procurementStrategicLabels:
No results.
- id:
- 2025-121268
- buyer:
1 results
- id:
- 665c4e3bf13fcf1b924218d5e61cd338
- organization_id:
- 977 161 630
- name:
- Energidepartementet
- heading:
- Study of the effects of dual policy instruments to reduce CO2 emissions in the Norwegian petroleum sector
- description:
- The majority of emissions from petroleum activities on the Norwegian continental shelf are subject to dual use of policy instruments (a carbon tax and the European emission trading system), resulting in high emission costs for the Norwegian petroleum sector. At the moment - the only two realistic solutions to reduce emission costs close to zero - are by replacing existing energy supply with power from shore or by shutting down the installations. Existing installations that are suitable for full or partial operation with power from shore already have implemented or are implementing such a solution. For the remaining installations, power from shore is seen as unrealistic, due to technical limitations, high cost and/or short remaining production period. Therefore, high emission costs resulting from the dual use of policy instruments (CO? tax and EU ETS) may, among other things, lead to fields and installations being shut down earlier than they otherwise would have been. The Ministry wants an independent study of the effects of a CO2-tax on top of EU ETS on future deliveries of oil and gas from the NCS, the net present value of production of oil and gas, production emissions and the net income to the state from the sector. The assignment will commence as soon as possible. The assignment should result in a written public report. The deliverables should be divided into a presentation of preliminary results, a first draft of report and a final report. The assignment is to be delivered within three months of contract signing. The consultant is to participate in meetings with the Ministry as agreed, but at a minimum, a start-up meeting, a status meeting with presentation of preliminary results, and a meeting to present the final report. The value of the procurement is estimated between 1 and 2 million NOK excl. VAT. This estimate is not binding for the Contracting authority. For further information on the scope and content of the procurement, we refer to appendix 1.
- location_id:
1 results
- anyw
- estimatedValue:
- currencyCode:
- NOK
- amount:
- 2000000.0
- type:
- ANNOUNCEMENT_OF_COMPETITION
- allTypes:
2 results
- COMPETITION
- ANNOUNCEMENT_OF_COMPETITION
- status:
- EXPIRED
- issueDate:
- 2025-12-19T15:33:37Z
- deadline:
- 2026-01-26T11:00:00Z
- sentToTed:
- yes
- publicationDate:
- 2025-12-23
- placeOfPerformance:
- procurementStrategicLabels:
No results.
- id:
- 2025-106762
- buyer:
1 results
- id:
- 3e6cca67e0586c20567c6349931f6b2e
- organization_id:
- 984661177
- name:
- Vygruppen AS
- heading:
- RFI: Remote Online Condition Monitoring for rolling stock
- description:
- The Vy Group AS (Vy) wants to explore the possibilities of installing Remote Online Monitoring system for rolling stock in Norway and Sweden. This is to both increase insight in rolling stock sensor data and potential savings and optimize maintenance cost. We are planning to issue an RFP during 2025 and wish to obtain up-to-date information about solutions that exist in the market today and the price-level to expect before we issue the RFP.
- location_id:
No results.
- estimatedValue:
- not reported by source
- type:
- ADVISORY_NOTICE
- allTypes:
2 results
- ADVISORY_NOTICE
- PLANNING
- status:
- not reported by source
- issueDate:
- 2025-04-29T09:55:06Z
- deadline:
- not reported by source
- sentToTed:
- yes
- publicationDate:
- 2025-04-30
- placeOfPerformance:
No results.
- procurementStrategicLabels:
No results.
- limit:
- 25
- offset:
- 0
- returned:
- 10
- has_more_results:
- yes
- truncated:
- yes
- next_offset:
- 10
Will you use the result in generated code?
Is data missing or incorrect? Send feedback about this result.
Continue exploring
How an AI agent should use this page
Ground rule: Navigate with HTML GET links to keep explanations and relationships. Use the page's JSON alternative only when concrete values must be extracted, compared or computed.
How to use the search_doffin lookup
- Replace the placeholders in the HTML GET template; remove optional parameters you do not need.
- Check types, units, limits and ID formats in the parameter table.
- Follow linked results to canonical pages before combining sources.
Misreading to avoid: An empty list means "no results for this lookup". An error message or unavailable source does not mean the data does not exist.
Source-specific next step
- Follow the notice ID to the canonical page; use CPV and location codes to narrow broad free-text searches.
Go to the source page for other operations. Use the JSON template only after the HTML result shows that the parameters and source are correct.
AI agent? Read the complete navigation and programming guide.