Study of the effects of dual policy instruments to reduce CO2 emissions in the Norwegian petroleum sector

Notice 2025-121268 · EXPIRED

Programmatic access to procurement data (JSON)

Source: Doffin og TED. Retrieved 2026-09-08T17:19:43Z.

Description

The majority of emissions from petroleum activities on the Norwegian continental shelf are subject to dual use of policy instruments (a carbon tax and the European emission trading system), resulting in high emission costs for the Norwegian petroleum sector. At the moment - the only two realistic solutions to reduce emission costs close to zero - are by replacing existing energy supply with power from shore or by shutting down the installations. Existing installations that are suitable for full or partial operation with power from shore already have implemented or are implementing such a solution. For the remaining installations, power from shore is seen as unrealistic, due to technical limitations, high cost and/or short remaining production period. Therefore, high emission costs resulting from the dual use of policy instruments (CO? tax and EU ETS) may, among other things, lead to fields and installations being shut down earlier than they otherwise would have been. The Ministry wants an independent study of the effects of a CO2-tax on top of EU ETS on future deliveries of oil and gas from the NCS, the net present value of production of oil and gas, production emissions and the net income to the state from the sector. The assignment will commence as soon as possible. The assignment should result in a written public report. The deliverables should be divided into a presentation of preliminary results, a first draft of report and a final report. The assignment is to be delivered within three months of contract signing. The consultant is to participate in meetings with the Ministry as agreed, but at a minimum, a start-up meeting, a status meeting with presentation of preliminary results, and a meeting to present the final report. The value of the procurement is estimated between 1 and 2 million NOK excl. VAT. This estimate is not binding for the Contracting authority. For further information on the scope and content of the procurement, we refer to appendix 1.

Oppdragsgivere

Place of performance

All notice data

id:
2025-121268
eFormId:
8abe1c74-ef4f-47af-8376-554a711a1fed
procedureId:
1e17644e-7126-4b4f-bd24-dc1fd4407877
heading:
Study of the effects of dual policy instruments to reduce CO2 emissions in the Norwegian petroleum sector
description:
The majority of emissions from petroleum activities on the Norwegian continental shelf are subject to dual use of policy instruments (a carbon tax and the European emission trading system), resulting in high emission costs for the Norwegian petroleum sector. At the moment - the only two realistic solutions to reduce emission costs close to zero - are by replacing existing energy supply with power from shore or by shutting down the installations. Existing installations that are suitable for full or partial operation with power from shore already have implemented or are implementing such a solution. For the remaining installations, power from shore is seen as unrealistic, due to technical limitations, high cost and/or short remaining production period. Therefore, high emission costs resulting from the dual use of policy instruments (CO? tax and EU ETS) may, among other things, lead to fields and installations being shut down earlier than they otherwise would have been. The Ministry wants an independent study of the effects of a CO2-tax on top of EU ETS on future deliveries of oil and gas from the NCS, the net present value of production of oil and gas, production emissions and the net income to the state from the sector. The assignment will commence as soon as possible. The assignment should result in a written public report. The deliverables should be divided into a presentation of preliminary results, a first draft of report and a final report. The assignment is to be delivered within three months of contract signing. The consultant is to participate in meetings with the Ministry as agreed, but at a minimum, a start-up meeting, a status meeting with presentation of preliminary results, and a meeting to present the final report. The value of the procurement is estimated between 1 and 2 million NOK excl. VAT. This estimate is not binding for the Contracting authority. For further information on the scope and content of the procurement, we refer to appendix 1.
buyer:

1 results

  1. id:
    977 161 630
    name:
    Energidepartementet
locationId:

1 results

  1. anyw
placeOfPerformance:
issueDate:
2025-12-19T15:33:37Z
deadline:
2026-01-26T11:00:00Z
qualificationDeadline:
not reported by source
noticeType:
ANNOUNCEMENT_OF_COMPETITION
allTypes:

2 results

  1. ANNOUNCEMENT_OF_COMPETITION
  2. COMPETITION
allCpvCodes:

17 results

  1. 73000000
  2. 73200000
  3. 73210000
  4. 76000000
  5. 79311300
  6. 79311400
  7. 79311410
  8. 90711300
  9. 90720000
  10. 79000000
  11. 79300000
  12. 79310000
  13. 79311000
  14. 90000000
  15. 90700000
  16. 90710000
  17. 90711000
directCpvCodes:

9 results

  1. 73000000
  2. 73200000
  3. 73210000
  4. 76000000
  5. 79311300
  6. 79311400
  7. 79311410
  8. 90711300
  9. 90720000
parentCpvCodes:

8 results

  1. 79000000
  2. 79300000
  3. 79310000
  4. 79311000
  5. 90000000
  6. 90700000
  7. 90710000
  8. 90711000
noticeStatus:
EXPIRED
allReceivedTenders:
not reported by source
preferredPublicationDateTed:
not reported by source
plannedDateTed:
not reported by source
competitionDocsUrl:
https://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=448066&TID=200409170&B=
sentToTed:
yes
regulationUrl:
https://lovdata.no/dokument/SF/forskrift/2016-08-12-974?q=foa
core:
estimatedValue:
amount:
2000000.0
code:
NOK
fullLocalizedText:
2000000.0 NOK
mainActivity:
gen-pub
awardedNames:

No results.

changeNotices:
not reported by source
limitedDataFlag:
no
publicationDate:
2025-12-23
tedId:
856482-2025
procurementTimeline:

1 results

  1. id:
    2025-121268
    allType:

    2 results

    1. ANNOUNCEMENT_OF_COMPETITION
    2. COMPETITION
    publicationDate:
    2025-12-23
    selectedNotice:
    yes
procurementStrategicLabels:

No results.

lotsNumber:
1
doffin_url:
https://doffin.no/notices/2025-121268

Continue exploring

How an AI agent should use this page

Ground rule: Navigate with HTML GET links to keep explanations and relationships. Use the page's JSON alternative only when concrete values must be extracted, compared or computed.

How to use the procurement page

Check the notice ID, status, publication/deadlines and whether the data comes from Doffin or TED. Follow the buyer to the company page and the delivery location to place search.