{"source":"doffin","operation":"search_doffin","parameters":{"query":"EMISSION SOLUTIONS AS","limit":25,"offset":0},"data":{"total_count":7,"hits":[{"id":"2025-121268","buyer":[{"id":"665c4e3bf13fcf1b924218d5e61cd338","organization_id":"977161630","name":"Energidepartementet"}],"heading":"Study of the effects of dual policy instruments to reduce CO2 emissions in the Norwegian petroleum sector","description":"The majority of emissions from petroleum activities on the Norwegian continental shelf are subject to dual use of policy instruments (a carbon tax and the European emission trading system), resulting in high emission costs for the Norwegian petroleum sector. At the moment - the only two realistic solutions to reduce emission costs close to zero - are by replacing existing energy supply with power from shore or by shutting down the installations. Existing installations that are suitable for full or partial operation with power from shore already have implemented or are implementing such a solution. For the remaining installations, power from shore is seen as unrealistic, due to technical limitations, high cost and/or short remaining production period. Therefore, high emission costs resulting from the dual use of policy instruments (CO? tax and EU ETS) may, among other things, lead to fields and installations being shut down earlier than they otherwise would have been. The Ministry wants an independent study of the effects of a CO2-tax on top of EU ETS on future deliveries of oil and gas from the NCS, the net present value of production of oil and gas, production emissions and the net income to the state from the sector.\n\nThe assignment will commence as soon as possible. The assignment should result in a written public report. The deliverables should be divided into a presentation of preliminary results, a first draft of report and a final report. The assignment is to be delivered within three months of contract signing. The consultant is to participate in meetings with the Ministry as agreed, but at a minimum, a start-up meeting, a status meeting with presentation of preliminary results, and a meeting to present the final report. \n\nThe value of the procurement is estimated between 1 and 2 million NOK excl. VAT. This estimate is not binding for the Contracting authority.\n\nFor further information on the scope and content of the procurement, we refer to appendix 1.","location_id":["anyw"],"estimatedValue":{"currencyCode":"NOK","amount":2000000.0},"type":"ANNOUNCEMENT_OF_COMPETITION","allTypes":["ANNOUNCEMENT_OF_COMPETITION","COMPETITION"],"status":"EXPIRED","issueDate":"2025-12-19T15:33:37Z","deadline":"2026-01-26T11:00:00Z","sentToTed":true,"publicationDate":"2025-12-23","placeOfPerformance":["Ikke stedbunden"],"procurementStrategicLabels":[]},{"id":"2024-116458","buyer":[{"id":"a17f0c4d9b21ae6f264d342bcf640d49","organization_id":"985198292","name":"AVINOR AS"}],"heading":"Declaration of intent - development of a flight test/demonstration program of zero- and low-emission aircraft","description":"Avinor AS and Civil Aviation Authority Norway (CAA Norway) intend to enter into a Letter of Intent (LoI) with Bristow Norway and Beta Technologies for the development of a flight test/demonstration program of zero- and low-emission aircraft. The purpose of the agreement is to develop solutions and knowledge related to future aircraft and requirements for airport operations/infrastructure, as well as conducting safe and efficient trials of new technology for regulatory learning and development within all relevant areas of aviation. Flights utilizing a battery-electric aircraft are estimated to take place after summer of 2025.\n\nAvinor\u2019s objective is to facilitate and support testing and demonstration of zero- and low-emission aircraft, airspace and operational development to gain more knowledge about new technologies, facilitation needs and explore their practical applications.\n\nCAA Norway's main objective is to contribute to safe, societally beneficial, and sustainable aviation. As an aviation authority, CAA Norway, in collaboration with EASA, will contribute to regulatory facilitation and learning. The purpose is to enable safe testing and phasing in of new technologies in an ecosystem. It will also enable the regulators to identify the need for regulatory changes and to ensure that approval and certification processes are well prepared and can be carried out efficiently.\n\nThe agreement is intended to accelerate the transition towards zero- and low-emission aviation and is part of the Avinor and CAA Norway collaboration to establish Norway as an international test arena for zero- and low-emission aircraft. Data and knowledge sharing is a key element of the agreement, and the activities will contribute to knowledge for the entire aviation ecosystem. The joint results of the research/development under the agreement will not be exclusive to the contracting parties, and in addition the financial burden is split between the parties. If a subsequent development phase provides a basis for it, the letter of intent will be replaced by a binding project agreement. Based on the above, the agreement is considered a research and development contract and is therefore exempt from the procurement regulation, cf. the Supply Regulations section 2-5. Any objections to the agreement should be submitted within 26.11.2024.\n\nFor more information, se Tendsign: https://tendsign.no/supplier/index.aspx","location_id":["AT112"],"estimatedValue":null,"type":"ANNOUNCEMENT_OF_INTENT","allTypes":["RESULT","ANNOUNCEMENT_OF_INTENT"],"status":null,"issueDate":"2024-11-15T10:05:36Z","deadline":null,"sentToTed":true,"publicationDate":"2024-11-15","placeOfPerformance":[null],"procurementStrategicLabels":[]},{"id":"2025-107436","buyer":[{"id":"c7e1e64fb9573a0e1e210f676919d6f1","organization_id":"977461804","name":"Tafjord Kraftvarme AS"}],"heading":"2025_TKV 12 Flue gas condensation Heat Pump District Heating - Request for information","description":"Tafjord Kraftvarme AS is considering the procurement and installation of a flue gas condensation (FGC) installation, intended to enhance the thermal efficiency of incinerator 2 for district heating production. The installation may be situated in the main production facility.The primary objective is to establish a robust, efficient, and reliable heating solution that integrates seamlessly into the current district heating system. Flue gas condensation utilization is expected to secure a long-term energy supply, enhance operational efficiency, and contribute to TKV\u2019s sustainability goals by reducing emissions and optimizing resource utilization.The scope of the RFI includes technologies that are capable of adapting to the operational varaiations in flue gas condensate and variable load conditions. All relevant information can be found in the encloed documents.","location_id":["NO0A3"],"estimatedValue":null,"type":"ANNOUNCEMENT_OF_COMPETITION","allTypes":["ANNOUNCEMENT_OF_COMPETITION","COMPETITION"],"status":"EXPIRED","issueDate":"2025-05-12T11:07:20Z","deadline":"2025-05-30T14:00:00Z","sentToTed":true,"publicationDate":"2025-05-13","placeOfPerformance":["M\u00f8re og Romsdal"],"procurementStrategicLabels":[]},{"id":"2025-107413","buyer":[{"id":"c7e1e64fb9573a0e1e210f676919d6f1","organization_id":"977461804","name":"Tafjord Kraftvarme AS"}],"heading":"2025_TKV 08 Seawater heat pump for district heating - Request for information","description":"Tafjord Kraftvarme AS is considering the procurement and installation of a new large-scale seawater-source heat pump, intended to replace part of the existing capacity within the district heatingnetwork. The installation may be situated in an existing facility located by the sea, in \u00c5lesund city centre.The primary objective is to establish a robust, efficient, and reliable heating solution that integrates seamlessly into the current district heating system. The seawater-source heat pump is expected to secure a long-term energy supply, enhance operational efficiency, and contribute to TKV\u2019s sustainability goals by reducing emissions and optimizing resource utilization.The scope of the RFI includes technologies that are capable of adapting to seasonal variations in seawater temperature and variable load conditions. All required information can be found in the enclosed documents.","location_id":["NO0A3"],"estimatedValue":null,"type":"ANNOUNCEMENT_OF_COMPETITION","allTypes":["ANNOUNCEMENT_OF_COMPETITION","COMPETITION"],"status":"EXPIRED","issueDate":"2025-05-12T08:22:13Z","deadline":"2025-05-30T14:00:00Z","sentToTed":true,"publicationDate":"2025-05-13","placeOfPerformance":["M\u00f8re og Romsdal"],"procurementStrategicLabels":[]},{"id":"2025-119716","buyer":[{"id":"0f5223b4541cca6e7a1cfe09866c2ef9","organization_id":"971278374","name":"STATSBYGG"}],"heading":"1105601 UiO Livsvitenskap brukerutstyr - K930.22 MST instrument","description":"Statsbygg bygger det nye Livsvitenskapsbygget (LVB) for Universitetet i Oslo og Oslo universitetssykehus p\u00e5 oppdrag fra Kunnskapsdepartementet og Helse S\u00f8r-\u00d8st som medoppdragsgiver. Bygget skal v\u00e6re arbeidsplass for om lag 1.600 ansatte og 1.600 studenter. Oppstart for grave- og grunnarbeidene var 2. kvartal 2019 og planlagt ferdigstillelse er ultimo 2026. Her skal ulike fagmilj\u00f8er jobbe tverrfaglig for \u00e5 utvikle nye l\u00f8sninger p\u00e5 store utfordringer innen helse og b\u00e6rekraft med tilgang til det beste og mest moderne utstyret som kreves for \u00e5 drive forskning, undervisning og innovasjon i verdensklasse.Statsbygg intends to sign a contract with NanoTemper Technologies for the acquisition of a MST instrument, intrinsic tryptophan fluorescence, for the Life Sciences Building.We intend to purchase an MST instrument that is a capillary-based instrument for the analysis of molecular interactions using a combination of microscale thermophoresis (MST) and spectral shift with fluorescently labeled molecules as the principle of detection. The instrument must be an all-in-one, table-top model, and not exceed w400 x d600 x h550 mm in size due to space restrictions. The instrument must be able to measure both modalities in the same experiment on the same sample.We are researching, among other things, protein-protein and protein-ligand interactions, and the ability to analyze such interactions at equilibrium in a flow-free environment that does not require protein immobilization is a key feature that the equipment must satisfy. It is also essential that the system can measure many samples in series, in solution and with minimal use of material per sample. Through professional expertise in the laboratory, as well as research done online, we find that Monolith X is the only system with the following characteristics:Can do a combination of microscale thermophoresis (MST) and spectral shift with fluorescently labeled molecules as the principle of detection in the same instrument.Is an instrument that is an all-in-one, table-top model, not exceeding the size limitation.The Instrument can measure real-time changes in fluorescence intensity upon binding of ligand to the labeled protein while simultaneously changing the temperature of the sample (modality: microscale thermophoresis, MST).The instrument can measure real-time changes in fluorescence emission spectrum upon binding of ligand to the labeled protein as a result of a change in the fluorophore's emission spectrum (modality: spectral shift).The instrument can measure both modalities in the same experiment on the same sample.Can measure samples in very small volumes, using very small amounts of samples.\u00a0 See Appendix 4.0 Requirements MST Instrument K930.22 specification for more information on absolute requirements.Send an e-mail to kristine.milner.carlsen@statsbygg.no to receive the 4.0 Requirements MST Instrument K930.22 document. Summary:Given our technical requirements and needs, including in the attached requirement specification, the information we have and the investigations that have been carried out, to the best of our knowledge only Nanotemper technologies meets the requirements and can therefore, for technical reasons, deliver the service. The conditions in FOA \u00a7 13-4 (b) are deemed to be met.\u00a0Any objections must be reported via e-mail to kristine.milner.carlsen@statsbygg.no within 10 days of the published announcement.","location_id":["NO081"],"estimatedValue":null,"type":"ANNOUNCEMENT_OF_INTENT","allTypes":["RESULT","ANNOUNCEMENT_OF_INTENT"],"status":null,"issueDate":"2025-12-10T08:29:58Z","deadline":null,"sentToTed":true,"publicationDate":"2025-12-11","placeOfPerformance":["Oslo"],"procurementStrategicLabels":[]},{"id":"2022-312464","buyer":[{"id":"fceee8e36f95e7c22be2a8c47ce2b93e","organization_id":"994686011","name":"AtB AS"}],"heading":"Dialogue Conference on Inductive Charging for e-buses in Trondheim","description":"AtB is a mobility company administrating the public transport in Tr\u00f8ndelag, Norway. AtB is responsible for planning, purchasing and marketing a provident public transport service.The current bus-contracts for the Trondheim area expire in August 2029. In new bus contracts starting 2029, requirements will be set for emission-free operation. One of the technologies that will be considered for the 2029-contracts is the possibilities for inductive charging. Technology suppliers and bus operators are invited to present and discuss their solutions, experiences or views on the possibilities inherent in inductive charging of e-buses at a dialogue conference at 04.05.2022 at 09.00-11.30 (CET).\u00a0The conference will be on Teams.","location_id":["NO060"],"estimatedValue":null,"type":"ADVISORY_NOTICE","allTypes":["ADVISORY_NOTICE","PLANNING"],"status":null,"issueDate":"2022-04-05T10:00:00Z","deadline":null,"sentToTed":true,"publicationDate":"2022-04-05","placeOfPerformance":[],"procurementStrategicLabels":[]},{"id":"2026-117883","buyer":[{"id":"ba604041997d8cf4073f2172ff7182fd","organization_id":"987592567","name":"Oslo kommune v/ Oslo Havn KF"}],"heading":"25HAV26 - Ship to shore container crane - Request for information","description":"Oslo Havn KF is a municipal enterprise owned by the City of Oslo, governed by its own board of directors.\n\nThe enterprise's objective is to ensure efficient and rational port operations to facilitate effective and environmentally friendly maritime transport, to oversee traffic within the municipality\u2019s maritime area, and to manage the port\u2019s properties and infrastructure in a financially and environmentally sound manner.\n\nOslo Havn holds the overall responsibility for the operation of the port and for exercising public authority within the municipality\u2019s maritime areas pursuant to the Norwegian Harbor\u2019s and Fairways Act. Oslo Havn's societal responsibility is to facilitate efficient and environmentally friendly maritime transport to and from Oslo, Norway, while minimizing societal costs through the modernization and development of contemporary port facilities.\n\nOslo Havn operates approximately 10 kilometers of quay infrastructure, including both open pile and solid fill quays, spread across multiple harbor areas. These structures support diverse maritime activities such as container shipping, ro-ro terminals, cruise traffic, urban logistics, and bulk transport. The infrastructure is managed and maintained with a strong emphasis on sustainability and digital transformation.\n\nOslo Havn's vision is to be the world\u2019s most space-efficient and environmentally friendly urban port. Oslo Havn aims to become one of the world\u2019s first zero-emission ports. To support this, Oslo Havn is investing in digital technologies, including underwater and above-water 3D scanning, digital twins, and condition-based maintenance strategies for its quay infrastructure.\n\nFor more information see https://www.oslohavn.no/en/ [https://www.oslohavn.no/en/]\n\n\nINTRODUCTION AND BACKGROUND FOR THE RFI\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\n\nOslo Havn owns the ship-to-shore (STS) cranes at the Sjurs\u00f8ya container terminal, which is operated by Yilport Oslo. The terminal currently has four STS cranes. Oslo Havn is planning to procure one new STS crane to replace one of the existing cranes. The new crane shall operate on the existing crane rails, fit between the existing cranes, and serve feeder and short-sea container vessels. The crane shall be delivered fully erected and shall be factory acceptance tested (FAT) before shipment.\n\nThe table below summarises the main parameters requested for the new crane. The parameters correspond to the existing cranes and quay infrastructure at Sjurs\u00f8ya and are based on Oslo Havn\u2019s draft technical specification. The figures are intended to give suppliers an understanding of the required crane class and are not binding requirements. Suppliers are welcome to comment on the parameters and propose alternative solutions.","location_id":["NO081"],"estimatedValue":null,"type":"ADVISORY_NOTICE","allTypes":["ADVISORY_NOTICE","PLANNING"],"status":null,"issueDate":"2026-11-17T08:36:06Z","deadline":null,"sentToTed":true,"publicationDate":"2026-11-18","placeOfPerformance":["Oslo"],"procurementStrategicLabels":[]}]},"entities":[{"type":"procurement","id":"2025-121268","namespace":"doffin:notice","canonical_id":"doffin:notice:2025-121268","name":"Study of the effects of dual policy instruments to reduce CO2 emissions in the Norwegian petroleum sector","description":"The majority of emissions from petroleum activities on the Norwegian continental shelf are subject to dual use of policy instruments (a carbon tax and the European emission trading system), resulting in high emission costs for the Norwegian petroleum sector. At the moment - the only two realistic solutions to reduce emission costs close to zero - are by replacing existing energy supply with power from shore or by shutting down the installations. Existing installations that are suitable for full or partial operation with power from shore already have implemented or are implementing such a solution. For the remaining installations, power from shore is seen as unrealistic, due to technical limitations, high cost and/or short remaining production period. Therefore, high emission costs resulting from the dual use of policy instruments (CO? tax and EU ETS) may, among other things, lead to fields and installations being shut down earlier than they otherwise would have been. The Ministry wants an independent study of the effects of a CO2-tax on top of EU ETS on future deliveries of oil and gas from the NCS, the net present value of production of oil and gas, production emissions and the net income to the state from the sector.\n\nThe assignment will commence as soon as possible. The assignment should result in a written public report. The deliverables should be divided into a presentation of preliminary results, a first draft of report and a final report. The assignment is to be delivered within three months of contract signing. The consultant is to participate in meetings with the Ministry as agreed, but at a minimum, a start-up meeting, a status meeting with presentation of preliminary results, and a meeting to present the final report. \n\nThe value of the procurement is estimated between 1 and 2 million NOK excl. VAT. This estimate is not binding for the Contracting authority.\n\nFor further information on the scope and content of the procurement, we refer to appendix 1.","source":"doffin","attributes":{"status":"EXPIRED"},"relationships":[{"type":"buyer","target":{"type":"organization","id":"977161630","namespace":"no:orgnr","canonical_id":"no:orgnr:977161630","name":"Energidepartementet"}}],"_links":{"wiki":"https://allemannsdata.com/wiki/anskaffelse/2025-121268/","api":"https://allemannsdata.com/wiki/api/v1/anskaffelser/2025-121268"}},{"type":"organization","id":"977161630","namespace":"no:orgnr","canonical_id":"no:orgnr:977161630","name":"Energidepartementet","description":"Buyer linked from the procurement notice.","source":"doffin","_links":{"wiki":"https://allemannsdata.com/wiki/selskap/977161630/","api":"https://allemannsdata.com/wiki/api/v1/selskaper/977161630"}},{"type":"procurement","id":"2024-116458","namespace":"doffin:notice","canonical_id":"doffin:notice:2024-116458","name":"Declaration of intent - development of a flight test/demonstration program of zero- and low-emission aircraft","description":"Avinor AS and Civil Aviation Authority Norway (CAA Norway) intend to enter into a Letter of Intent (LoI) with Bristow Norway and Beta Technologies for the development of a flight test/demonstration program of zero- and low-emission aircraft. The purpose of the agreement is to develop solutions and knowledge related to future aircraft and requirements for airport operations/infrastructure, as well as conducting safe and efficient trials of new technology for regulatory learning and development within all relevant areas of aviation. Flights utilizing a battery-electric aircraft are estimated to take place after summer of 2025.\n\nAvinor\u2019s objective is to facilitate and support testing and demonstration of zero- and low-emission aircraft, airspace and operational development to gain more knowledge about new technologies, facilitation needs and explore their practical applications.\n\nCAA Norway's main objective is to contribute to safe, societally beneficial, and sustainable aviation. As an aviation authority, CAA Norway, in collaboration with EASA, will contribute to regulatory facilitation and learning. The purpose is to enable safe testing and phasing in of new technologies in an ecosystem. It will also enable the regulators to identify the need for regulatory changes and to ensure that approval and certification processes are well prepared and can be carried out efficiently.\n\nThe agreement is intended to accelerate the transition towards zero- and low-emission aviation and is part of the Avinor and CAA Norway collaboration to establish Norway as an international test arena for zero- and low-emission aircraft. Data and knowledge sharing is a key element of the agreement, and the activities will contribute to knowledge for the entire aviation ecosystem. The joint results of the research/development under the agreement will not be exclusive to the contracting parties, and in addition the financial burden is split between the parties. If a subsequent development phase provides a basis for it, the letter of intent will be replaced by a binding project agreement. Based on the above, the agreement is considered a research and development contract and is therefore exempt from the procurement regulation, cf. the Supply Regulations section 2-5. Any objections to the agreement should be submitted within 26.11.2024.\n\nFor more information, se Tendsign: https://tendsign.no/supplier/index.aspx","source":"doffin","attributes":{"status":null},"relationships":[{"type":"buyer","target":{"type":"organization","id":"985198292","namespace":"no:orgnr","canonical_id":"no:orgnr:985198292","name":"AVINOR AS"}}],"_links":{"wiki":"https://allemannsdata.com/wiki/anskaffelse/2024-116458/","api":"https://allemannsdata.com/wiki/api/v1/anskaffelser/2024-116458"}},{"type":"organization","id":"985198292","namespace":"no:orgnr","canonical_id":"no:orgnr:985198292","name":"AVINOR AS","description":"Buyer linked from the procurement notice.","source":"doffin","_links":{"wiki":"https://allemannsdata.com/wiki/selskap/985198292/","api":"https://allemannsdata.com/wiki/api/v1/selskaper/985198292"}},{"type":"procurement","id":"2025-107436","namespace":"doffin:notice","canonical_id":"doffin:notice:2025-107436","name":"2025_TKV 12 Flue gas condensation Heat Pump District Heating - Request for information","description":"Tafjord Kraftvarme AS is considering the procurement and installation of a flue gas condensation (FGC) installation, intended to enhance the thermal efficiency of incinerator 2 for district heating production. The installation may be situated in the main production facility.The primary objective is to establish a robust, efficient, and reliable heating solution that integrates seamlessly into the current district heating system. Flue gas condensation utilization is expected to secure a long-term energy supply, enhance operational efficiency, and contribute to TKV\u2019s sustainability goals by reducing emissions and optimizing resource utilization.The scope of the RFI includes technologies that are capable of adapting to the operational varaiations in flue gas condensate and variable load conditions. All relevant information can be found in the encloed documents.","source":"doffin","attributes":{"status":"EXPIRED"},"relationships":[{"type":"buyer","target":{"type":"organization","id":"977461804","namespace":"no:orgnr","canonical_id":"no:orgnr:977461804","name":"Tafjord Kraftvarme AS"}}],"_links":{"wiki":"https://allemannsdata.com/wiki/anskaffelse/2025-107436/","api":"https://allemannsdata.com/wiki/api/v1/anskaffelser/2025-107436"}},{"type":"organization","id":"977461804","namespace":"no:orgnr","canonical_id":"no:orgnr:977461804","name":"Tafjord Kraftvarme AS","description":"Buyer linked from the procurement notice.","source":"doffin","_links":{"wiki":"https://allemannsdata.com/wiki/selskap/977461804/","api":"https://allemannsdata.com/wiki/api/v1/selskaper/977461804"}},{"type":"procurement","id":"2025-107413","namespace":"doffin:notice","canonical_id":"doffin:notice:2025-107413","name":"2025_TKV 08 Seawater heat pump for district heating - Request for information","description":"Tafjord Kraftvarme AS is considering the procurement and installation of a new large-scale seawater-source heat pump, intended to replace part of the existing capacity within the district heatingnetwork. The installation may be situated in an existing facility located by the sea, in \u00c5lesund city centre.The primary objective is to establish a robust, efficient, and reliable heating solution that integrates seamlessly into the current district heating system. The seawater-source heat pump is expected to secure a long-term energy supply, enhance operational efficiency, and contribute to TKV\u2019s sustainability goals by reducing emissions and optimizing resource utilization.The scope of the RFI includes technologies that are capable of adapting to seasonal variations in seawater temperature and variable load conditions. All required information can be found in the enclosed documents.","source":"doffin","attributes":{"status":"EXPIRED"},"relationships":[{"type":"buyer","target":{"type":"organization","id":"977461804","namespace":"no:orgnr","canonical_id":"no:orgnr:977461804","name":"Tafjord Kraftvarme AS"}}],"_links":{"wiki":"https://allemannsdata.com/wiki/anskaffelse/2025-107413/","api":"https://allemannsdata.com/wiki/api/v1/anskaffelser/2025-107413"}},{"type":"procurement","id":"2025-119716","namespace":"doffin:notice","canonical_id":"doffin:notice:2025-119716","name":"1105601 UiO Livsvitenskap brukerutstyr - K930.22 MST instrument","description":"Statsbygg bygger det nye Livsvitenskapsbygget (LVB) for Universitetet i Oslo og Oslo universitetssykehus p\u00e5 oppdrag fra Kunnskapsdepartementet og Helse S\u00f8r-\u00d8st som medoppdragsgiver. Bygget skal v\u00e6re arbeidsplass for om lag 1.600 ansatte og 1.600 studenter. Oppstart for grave- og grunnarbeidene var 2. kvartal 2019 og planlagt ferdigstillelse er ultimo 2026. Her skal ulike fagmilj\u00f8er jobbe tverrfaglig for \u00e5 utvikle nye l\u00f8sninger p\u00e5 store utfordringer innen helse og b\u00e6rekraft med tilgang til det beste og mest moderne utstyret som kreves for \u00e5 drive forskning, undervisning og innovasjon i verdensklasse.Statsbygg intends to sign a contract with NanoTemper Technologies for the acquisition of a MST instrument, intrinsic tryptophan fluorescence, for the Life Sciences Building.We intend to purchase an MST instrument that is a capillary-based instrument for the analysis of molecular interactions using a combination of microscale thermophoresis (MST) and spectral shift with fluorescently labeled molecules as the principle of detection. The instrument must be an all-in-one, table-top model, and not exceed w400 x d600 x h550 mm in size due to space restrictions. The instrument must be able to measure both modalities in the same experiment on the same sample.We are researching, among other things, protein-protein and protein-ligand interactions, and the ability to analyze such interactions at equilibrium in a flow-free environment that does not require protein immobilization is a key feature that the equipment must satisfy. It is also essential that the system can measure many samples in series, in solution and with minimal use of material per sample. Through professional expertise in the laboratory, as well as research done online, we find that Monolith X is the only system with the following characteristics:Can do a combination of microscale thermophoresis (MST) and spectral shift with fluorescently labeled molecules as the principle of detection in the same instrument.Is an instrument that is an all-in-one, table-top model, not exceeding the size limitation.The Instrument can measure real-time changes in fluorescence intensity upon binding of ligand to the labeled protein while simultaneously changing the temperature of the sample (modality: microscale thermophoresis, MST).The instrument can measure real-time changes in fluorescence emission spectrum upon binding of ligand to the labeled protein as a result of a change in the fluorophore's emission spectrum (modality: spectral shift).The instrument can measure both modalities in the same experiment on the same sample.Can measure samples in very small volumes, using very small amounts of samples.\u00a0 See Appendix 4.0 Requirements MST Instrument K930.22 specification for more information on absolute requirements.Send an e-mail to kristine.milner.carlsen@statsbygg.no to receive the 4.0 Requirements MST Instrument K930.22 document. Summary:Given our technical requirements and needs, including in the attached requirement specification, the information we have and the investigations that have been carried out, to the best of our knowledge only Nanotemper technologies meets the requirements and can therefore, for technical reasons, deliver the service. The conditions in FOA \u00a7 13-4 (b) are deemed to be met.\u00a0Any objections must be reported via e-mail to kristine.milner.carlsen@statsbygg.no within 10 days of the published announcement.","source":"doffin","attributes":{"status":null},"relationships":[{"type":"buyer","target":{"type":"organization","id":"971278374","namespace":"no:orgnr","canonical_id":"no:orgnr:971278374","name":"STATSBYGG"}}],"_links":{"wiki":"https://allemannsdata.com/wiki/anskaffelse/2025-119716/","api":"https://allemannsdata.com/wiki/api/v1/anskaffelser/2025-119716"}},{"type":"organization","id":"971278374","namespace":"no:orgnr","canonical_id":"no:orgnr:971278374","name":"STATSBYGG","description":"Buyer linked from the procurement notice.","source":"doffin","_links":{"wiki":"https://allemannsdata.com/wiki/selskap/971278374/","api":"https://allemannsdata.com/wiki/api/v1/selskaper/971278374"}},{"type":"procurement","id":"2022-312464","namespace":"doffin:notice","canonical_id":"doffin:notice:2022-312464","name":"Dialogue Conference on Inductive Charging for e-buses in Trondheim","description":"AtB is a mobility company administrating the public transport in Tr\u00f8ndelag, Norway. AtB is responsible for planning, purchasing and marketing a provident public transport service.The current bus-contracts for the Trondheim area expire in August 2029. In new bus contracts starting 2029, requirements will be set for emission-free operation. One of the technologies that will be considered for the 2029-contracts is the possibilities for inductive charging. Technology suppliers and bus operators are invited to present and discuss their solutions, experiences or views on the possibilities inherent in inductive charging of e-buses at a dialogue conference at 04.05.2022 at 09.00-11.30 (CET).\u00a0The conference will be on Teams.","source":"doffin","attributes":{"status":null},"relationships":[{"type":"buyer","target":{"type":"organization","id":"994686011","namespace":"no:orgnr","canonical_id":"no:orgnr:994686011","name":"AtB AS"}}],"_links":{"wiki":"https://allemannsdata.com/wiki/anskaffelse/2022-312464/","api":"https://allemannsdata.com/wiki/api/v1/anskaffelser/2022-312464"}},{"type":"organization","id":"994686011","namespace":"no:orgnr","canonical_id":"no:orgnr:994686011","name":"AtB AS","description":"Buyer linked from the procurement notice.","source":"doffin","_links":{"wiki":"https://allemannsdata.com/wiki/selskap/994686011/","api":"https://allemannsdata.com/wiki/api/v1/selskaper/994686011"}},{"type":"procurement","id":"2026-117883","namespace":"doffin:notice","canonical_id":"doffin:notice:2026-117883","name":"25HAV26 - Ship to shore container crane - Request for information","description":"Oslo Havn KF is a municipal enterprise owned by the City of Oslo, governed by its own board of directors.\n\nThe enterprise's objective is to ensure efficient and rational port operations to facilitate effective and environmentally friendly maritime transport, to oversee traffic within the municipality\u2019s maritime area, and to manage the port\u2019s properties and infrastructure in a financially and environmentally sound manner.\n\nOslo Havn holds the overall responsibility for the operation of the port and for exercising public authority within the municipality\u2019s maritime areas pursuant to the Norwegian Harbor\u2019s and Fairways Act. Oslo Havn's societal responsibility is to facilitate efficient and environmentally friendly maritime transport to and from Oslo, Norway, while minimizing societal costs through the modernization and development of contemporary port facilities.\n\nOslo Havn operates approximately 10 kilometers of quay infrastructure, including both open pile and solid fill quays, spread across multiple harbor areas. These structures support diverse maritime activities such as container shipping, ro-ro terminals, cruise traffic, urban logistics, and bulk transport. The infrastructure is managed and maintained with a strong emphasis on sustainability and digital transformation.\n\nOslo Havn's vision is to be the world\u2019s most space-efficient and environmentally friendly urban port. Oslo Havn aims to become one of the world\u2019s first zero-emission ports. To support this, Oslo Havn is investing in digital technologies, including underwater and above-water 3D scanning, digital twins, and condition-based maintenance strategies for its quay infrastructure.\n\nFor more information see https://www.oslohavn.no/en/ [https://www.oslohavn.no/en/]\n\n\nINTRODUCTION AND BACKGROUND FOR THE RFI\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\n\nOslo Havn owns the ship-to-shore (STS) cranes at the Sjurs\u00f8ya container terminal, which is operated by Yilport Oslo. The terminal currently has four STS cranes. Oslo Havn is planning to procure one new STS crane to replace one of the existing cranes. The new crane shall operate on the existing crane rails, fit between the existing cranes, and serve feeder and short-sea container vessels. The crane shall be delivered fully erected and shall be factory acceptance tested (FAT) before shipment.\n\nThe table below summarises the main parameters requested for the new crane. The parameters correspond to the existing cranes and quay infrastructure at Sjurs\u00f8ya and are based on Oslo Havn\u2019s draft technical specification. The figures are intended to give suppliers an understanding of the required crane class and are not binding requirements. Suppliers are welcome to comment on the parameters and propose alternative solutions.","source":"doffin","attributes":{"status":null},"relationships":[{"type":"buyer","target":{"type":"organization","id":"987592567","namespace":"no:orgnr","canonical_id":"no:orgnr:987592567","name":"Oslo kommune v/ Oslo Havn KF"}}],"_links":{"wiki":"https://allemannsdata.com/wiki/anskaffelse/2026-117883/","api":"https://allemannsdata.com/wiki/api/v1/anskaffelser/2026-117883"}},{"type":"organization","id":"987592567","namespace":"no:orgnr","canonical_id":"no:orgnr:987592567","name":"Oslo kommune v/ Oslo Havn KF","description":"Buyer linked from the procurement notice.","source":"doffin","_links":{"wiki":"https://allemannsdata.com/wiki/selskap/987592567/","api":"https://allemannsdata.com/wiki/api/v1/selskaper/987592567"}}],"_meta":{"retrieved_at":"2026-11-21T18:38:33Z","language":"en","content_languages":["en"],"sources":[{"id":"doffin","name":"Doffin and TED","description":"Search Norwegian and European public procurement, notices and CPV codes.","publisher":"Direktoratet for forvaltning og \u00f8konomistyring (DF\u00d8)","license":"https://creativecommons.org/licenses/by/4.0/","cache_ttl_seconds":60}],"cache":{"hit":false,"stored_at":"2026-11-21T18:38:33Z","expires_at":"2026-11-21T18:39:33Z","ttl_seconds":60,"remaining_ttl_seconds":60,"age_seconds":0,"scope":"process"},"result_count":7,"requested_limit":25,"possibly_truncated":false,"pagination":{"limit":25,"offset":0,"returned":7,"has_more_results":false,"next_offset":null,"total_available":7},"total_available":7,"response_size_ceiling_bytes":65536,"response_size_ceiling_enforced":true,"truncated":false},"_provenance":{"data":{"source":"doffin","source_api":"https://allemannsdata.com/wiki/api/v1/kilder/doffin"},"entities":{"source":"doffin","source_api":"https://allemannsdata.com/wiki/api/v1/kilder/doffin","derived_from":"#/data","description":"Normalized projection of data."}},"_links":{"self":"https://allemannsdata.com/wiki/api/v1/kilder/doffin/search_doffin?offset=0&query=EMISSION+SOLUTIONS+AS","source":"https://allemannsdata.com/wiki/api/v1/kilder/doffin","wiki":"https://allemannsdata.com/wiki/kilder/doffin/search_doffin/?query=EMISSION+SOLUTIONS+AS&limit=25&offset=0","feedback":"https://allemannsdata.com/wiki/api/v1/feedback"},"output_fields":["total_count","hits","hits[].id","hits[].heading","hits[].description","hits[].buyer","hits[].buyer[].id","hits[].buyer[].organization_id","hits[].buyer[].name","hits[].type","hits[].allTypes","hits[].status","hits[].issueDate","hits[].deadline","hits[].publicationDate","hits[].sentToTed","hits[].estimatedValue","hits[].estimatedValue.currencyCode","hits[].estimatedValue.amount","hits[].location_id","hits[].placeOfPerformance","hits[].possible_placeholder","note","hits[].procurementStrategicLabels"],"output_fields_truncated":false,"canonical_field_aliases":{"identifier":["hits[].id","hits[].buyer[].id"],"name":["hits[].heading","hits[].buyer[].name"]}}
